| Location: | Texas |
|---|---|
| Posted: | Jan 16, 2025 |
| Due: | Feb 6, 2025 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0071 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of approximately 4,750 linear feet of 16-inch water line installed using open cut method, with one bore crossing encased in approximately 80 linear feet of 30-inch steel, and 4,800 linear feet of variable diameter sewer main installed using open cut, with once bore crossing under Union Pacific Railroad for a length of approximately 155 linear feet of 30-inch steel. Water structure include gate valves, fire hydrants and one combination air valve. The sewer construction will occur within Aledo Road county ROW.

With GovernmentContracts, you can:
...Splitter Box in preparation for Stop Gate replacement. Replacement of existing Stop Gates ...
City of League City
Bid Due: 9/23/2026
...Box in preparation for Stop Gate replacement. Replacement of existing Stop Gates located... ...
City of League City
Bid Due: 10/01/2026