| Location: | Connecticut |
|---|---|
| Posted: | Jul 27, 2026 |
| Due: | Aug 27, 2026 |
| Agency: | Town of Clinton |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PW2026-01 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
PW2026-01
|
| Bid Title: |
REQUEST FOR QUALIFICATIONS Replacement of Bridge No 06956
|
| Category: | Bids Documents |
| Status: | Open |
|
TOWNOFCLINTON
CONTRACT#PW2026-01
STATEPROJECT#0027-0129
REQUESTFORQUALIFICATIONS
REPLACEMENTOFBRIDGENO.06956
COUNTRYVILLAGELANEOVERUNNAMEDBROOK
TheTownofClintonseekstoengageaConsultingEngineeringFirmtoprovideInspectionServicesduring2027forthefollowing
transportationproject:
REPLACEMENTOFBRIDGENO.06956
COUNTRYVILLAGELANEOVERUNNAMEDBROOK
Theconstructioncostisexpectedtobeintherangeof$1,500,000-$2,000,000.TheConsultingEngineerwillbeevaluatedandselectedbased
ontechnicalcompetence,thecapacityandcapabilitytoperformtheworkwithinthetimeallotted,pastrecordofperformance,andknowledge
ofFederal,StateandtownofClintonprocedures,approximatelyweightedindescendingorderofimportance.Theconstructioninspectionfee
willbenegotiatedonacostplusbasis.
Firmsrespondingtothisrequestshouldbeofadequatesizeandsufficientlystaffedtoperformtheassignmentdescribedabove.Theselected
firmmustmeetalltownofClinton,State,andFederalaffirmativeactionandequalemploymentopportunitypractices.
Aletterofinterest,togetherwithgeneralinformationonthefirmandproposedsubconsultants,thefirm'sbrochure,currentFederalGSAForm
330,experienceofthefirms,andaresumeofkeypersonnelshouldbeaddressedtoToddHajek,DPWDirector,117NodRoadClinton,CT
06413.Additionally,allinterestedfirmsmustsubmitadetailedstatementincludingtheorganizationalstructureunderwhichthefirmproposes
toconductbusiness.Proposedsubconsultantsshouldbeclearlyidentified.Therelationshiptoany"parent"firmorsubsidiaryfirm,withany
ofthepartiesconcerned,mustbeclearlydefined.
Projectpersonnelwillberequiredtohavethefollowingexperienceforeachclassificationlisted:
ConstructionCoordinator
* The Construction Coordinator will be responsible for coordination between the administering unit of the Municipality,
Department,ConsultingFirm,andprojectstafftoresolveproblemsconcerningactivitiesrelatedtotheproject.
* Experience:
1. Notlessthanfifteen(15)yearemploymentincivilorhighwayengineeringofwhichatleastsix(6)yearsmusthavebeen
inasupervisorycapacityofcomplexhighwayand/orbridgeconstructionactivities,verticalorrailconstructionactivities
asrequired,andatleastfour(4)yearsofwhichwillhavebeeninfieldinspectionactivities.ABachelorofScienceDegree
inCivilorConstructionEngineeringmaybesubstitutedfortwo(2)yearsofgeneralexperiencerequirement.
2. Haveconsiderableknowledgeofconstructionpracticesandproceduresasrequired;abilitytopreparecorrespondence,
reports,andrecommendationsconcerningconstructionissues;thedemonstratedabilitytodealeffectivelywithothers;
theabilitytosupervise.
ChiefInspector-Level2(LowComplexityProjects;typically,under$5Million):
* Experience:
1. Notlessthaneight(8)yearsemploymentincivil,highwayorarelevantengineeringfieldofwhichthree(3)yearsmust
havebeeninasupervisorycapacityofhighway,bridge,facilities,orrailconstructionactivities,asrequired;atleastfour
(4)yearsofwhichshallhavebeeninfieldinspectionactivities.
2. Haveconsiderableknowledgeofhighway,bridge,facilities,orrailconstructionpracticesandproceduresasrequired;
abilitytopreparecorrespondence,reports,andrecommendationsconcerningconstructionissues;demonstratedability
todealeffectivelywithothers;theabilitytosupervise;andtheabilitytoestablishandmaintainprojectrecords.
* Certifications: NICET Level III Certification in Transportation/Highway Construction is required, except for those people
possessingacurrentProfessionalEngineer'sLicenseregisteredintheStateofConnecticut(PE).
SurveyPartyChief:
* Experience:
1. Notlessthanfour(4)yearsofconstructionsurveyexperienceofwhichatleastthree(3)yearsshallhavebeenasan
instrumentpersonorsurveypartychief.
2. Haveconsiderableknowledgeofprinciplesandmethodsoflandsurveying;knowledgeofprinciplesandpractices
ofhighwayengineering;theabilitytokeepandreducefieldnotes;theabilitytodetermineconstructionquantities
andamountsoncompletedprojects;theabilitytosupervisethelayoutoflimitsofworkandgrades,abilitytocheck
contractor'ssurveylayoutforaccuracy;theabilitytolayoutfoundations,railtracklayouts,abutments,culvertsandpipe
lines;theabilitytore-establishboundarylinesandstake-takinglines;andtheabilitytoprepareas-builtplansandother
relateddutiesasrequired.
* Licensing:LandSurveyorLicenseintheStateofConnecticutorshallbeworkingunderthedirectsupervisionofamemberof
theConsultingEngineer'sstaff.
QuestionsaboutthisrequestforqualificationsaretobesubmittedelectronicallytoToddHajek,DPWDirectoratthajek@clintonct.gov.All
questionsandanswerswillbeonthetownofClintonwebsite.Questionswillbeaccepteduntil4:30P.M.onAugust11th,2026;answerswillbe
submittedby4:30P.M.onAugust17th,2026.Interestedfirmsarerequiredtosubmitoneoriginalcopyviadigitalmediaoftheirqualifications
toMichelleBenivegna,TownManager,nolaterthanAugust26th,2026,at4:00pm.Submissionsmaybemadeviaemail,sharedfileservice,
orUSBdrive;theTowndoesnotassumeresponsibilityforfailureofsubmissionstobereceivedbytheTownbythedateandtimenotedabove.
Responsesreceivedafterthisdatewillnotbeconsidered.
TheTownofClintonisanAffirmativeActionEqualOpportunityEmployer.Minority/Women'sBusinessEnterprisesareencouragedtoapply.
MichelleBenivegna
TownManager
TownofClinton

With GovernmentContracts, you can:
RFP # 927024 HVAC Upgrade Stanley T. Williams Community Center (STWCC) The Town
State Government of Connecticut
Bid Due: 9/16/2026
Apparel and Promotional Items Start Date : August 18, 2026 04:30:00 PM EDT
State Government of Connecticut
Bid Due: 9/18/2026
2027-05 HVAC Upgrades - Wilcoxson School due 09/17/2026 2027-05 HVAC Upgrades - Wilcoxson
Town of Stratford
Bid Due: 9/17/2026
2027-04 Property Redevelopment of former Ella T. Grasso Regional Center due 09/30/2026 2027-04
Town of Stratford
Bid Due: 9/30/2026