CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION

Location: Puerto Rico
Posted: Apr 25, 2025
Due: Jun 17, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: W51DQV25RA004
Publication URL: To access bid details, please log in.
Follow
CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Active
Contract Opportunity
Notice ID
W51DQV25RA004
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Office
W2SR TF VIPR
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Apr 25, 2025 03:10 pm AST
  • Original Published Date: Apr 08, 2025 09:55 pm AST
  • Updated Date Offers Due: Jun 17, 2025 02:00 pm AST
  • Original Date Offers Due: Jun 17, 2025 02:00 pm AST
  • Inactive Policy: Manual
  • Updated Inactive Date: Oct 05, 2025
  • Original Inactive Date: Oct 05, 2025
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside:
  • Product Service Code: Z2KB - REPAIR OR ALTERATION OF CANALS
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918 00918
Description View Changes
This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos� Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions.
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 383 FRANKLIN D ROOSEVELT AVENUE
  • SAN JUAN , PR 00918-0000
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Apr 9, 2025[Solicitation (Original)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
May 7, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jun 5, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jun 8, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jun 12, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jun 23, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jun 25, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jul 11, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Jul 28, 2025[Solicitation (Updated)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Sep 30, 2025[Award Notice (Original)] CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow USBR Patillas Dam Seismic Retrofit Design Update and Industry Outreach Active Contract

DEPT OF DEFENSE

Bid Due: 6/11/2026

Follow HUBZone vendors for Puerto Rico and USVI Security Systems Maintenance Active Contract

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 6/10/2026

Follow Sources Sought Notice - Morovis National Cemetery, Phase 1B Active Contract Opportunity

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/10/2026

Follow Pilot Locker Restroom Renovation Active Contract Opportunity Notice ID 31171-25201 Related Notice

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 8/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.