BLD A Cooling Upgrades

Location: District of Columbia
Posted: May 5, 2026
Due: Jun 2, 2026
Agency: District of Columbia Courts
Type of Government: State & Local
Category:
  • 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
  • Y - Construction of Structures and Facilities
Solicitation No: DCSC-26-RFP-068
Publication URL: To access bid details, please log in.
Solicitation # Details Opening Date Closing Date Other Documents
DCSC-26-RFP-068
BLD A Cooling Upgrades
May 05, 2026 Jun 02, 2026

Attachment Preview

a0SOLICITATION, OFFER, AND AWARD
2. Reference Number
3. Solicitation Number
DCSC-26-RFP-068
BLDA Cooling System Upgrades
4. Type of Solicitation
Sealed Bid (IFB)
Sealed Proposals (RFP)
5. Date Issued
05/05/2026
Page of Pages
1 59
6. Type of Market
Open
Set Aside
7. Issued By
8. Address Offer to:
District of Columbia Courts
District of Columbia Courts
Capital Project Facilities Management Division
Administrative Services Division
510 4th St. NW, Suite 214
Procurement and Contracts Branch
Washington, DC. 20001
510 4th St. NW, Suite 326
Washington, D.C. 20001
ATTN: Kenneth L. Evans Jr
NOTE: In the sealed bid, solicitations “offer” or “Contractor” means “bid or “bidder.
SOLICITATION
9. THE DISTRICT OF COLUMBIA COURTS REQUIRES PERFORMANCE OF THE WORKS DESCRIBED IN THESE DOCUMENTS (Title, date)
A Prebid will be held Monday, May 11, 2026, promptly @ 10:00 AM in Building B, 510 4th St, Suit #214.06
A site walk will be held Monday, May 11, 2026, promptly @ 11:00 AM, immediately following the Prebid.
Offerors shall provide the following information no later than Monday, May 11 @10:00 AM, for all participants to (e-mail): Kenneth.Evans@dccsystem.gov, Contract
Specialist to participate in the conference call
a) Full name of the attendee
b) Name of the company the attendee is affiliated with
c) and email address
10. The Contracting Officer shall issue the Notice to Proceed no later than _120 calendar days after contract award. The Contractor shall achieve Final Completion within
_300_ days after receiving the Notice to Proceed.
11. THE CONTRACTOR MUST FURNISH ANY REQUIRED BID, PERFORMANCE, PAYMENT AND WARRANTY BONDS
Bid Bond
Yes____ No____ _ __% of the total amount of their proposal
Performance and Payment Bond Yes_X__ No____ 100 __% Within ___5__ Calendar days after receiving the notice to proceed
Warranty
Yes_X__ No____ 100 __% Within _ _5__ Calendar days after final acceptance
12. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers an original, and __4__ copies to perform the work required are due at the place specified in Item 8 by Tuesday , June 02, 2026, at 3:00 PM (date).
b. Proposals shall be submitted in two parts, titled "Technical Proposal" and "Price Proposal."
c. A separate electronic copy of the entire proposal should accompany the package.
d. Sealed envelopes shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
e. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
CAUTION: See Section L.1.2Proposal submission date and time, and late submissions, late modification, withdrawal or modification of proposals and late
proposals. All offers are subject to all terms & conditions contained in the solicitation
13. For Information
A. Name
B. Telephone
C. E-mail Address
Contact
Kenneth L. Evans Jr
(Area Code)
(Number)
(Ext) kenneth.evans@dccsystem.gov
(202)
879-8776
14. Table of Contents
(X)
Section
Description
Page (X) Section
Description
Page No.
No.
PART I THE SCHEDULE
PART II CONTRACT CLAUSES
X
A Solicitation/Contract Form
1
X
I Contract Clauses
28
X
B Supplies or Services and Price/Cost
2
PART III LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
X
C Specifications/Work Statement
4
X
J List of Attachments
42
X
D Packaging and Marking
11
PART IV REPRESENTATIONS AND INSTRUCTIONS
X
E Inspection and Acceptance
12
Representations, certification and other
43
X
F Deliveries or Performance
14
X
K statements of Contractors
X
G Contract Administration Data
16
X
L Instructions, conditions & notices to
49
Contractors
X
H Special Contract Requirements
26
X
M Evaluation factors for award
58
15. In conjunction with the above, the undersigned agrees, if this offer is accepted within _____120________ calendar days from the receipt
of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within
the time specified herein.
15A.
Name and Address
of Contractor
15B. Telephone
(Area Code)
(Number)
SOLICITATION, OFFER, AND AWARD (Continue d)
(Construction, Alteration, or Repair)
15D. Name and Title of Person Authorized to Sign Offer/Contract
15 C. Check if remittance
(Ext) address is different from above
Refer to section G
15E. Signature and Corporate Seal
All written communications regarding this solicitation should be addressed to the Contracting Officer at the mailing address listed on page 1.
DCSC-26-RFP-068
SECTION B: CONTRACT TYPE, SUPPLIES OR SERVICES AND
PRICE/COST
B.1 Project Purpose
The District of Columbia Courts (the “Courts”), Procurement and Contracts Branch on behalf of
the Capital Projects and Facilities Management Division (CPFMD) is seeking a contractor to
provide construction services for the BLDA Cooling System Upgrades project located at the DC
Superior Courts Probate Division, also known as Building A (BLDA), at 515 5th St NW,
Washington, DC 20001.
B.2 The Court contemplates award of a Single firm fixed contract.
B.3 SERVICES
The Contractor shall provide all professional, technical, supervision, labor, materials, and
equipment for the construction of the BLDA Cooling System Upgrades.
B.4 PRICE SCHEDULE:
B.4.1 Base Bid Price / Section Pricing: Refer to SECTION K, Attachment K Tab K.1
The Contractor shall perform all efforts in accordance with the requirements of this contract for
the firm fixed price (“FFP”) below and as further specified in the Contractor’s pricing proposal.
This FFP shall include all direct labor, materials, equipment, communication, and other direct
costs as well as all indirect costs, subcontractor costs, commissions, and any other profit and
expenses for which the Contractor expects payment. No additional charge shall be made by the
Contractor to complete the scope outlined in this Request For Proposal (RFP). The Contractor
shall also guarantee said offered price and itemized pricing, free from any change, for one
hundred and twenty (120) days from the date of the submission of its proposal.
In addition to the base scope, the Owner requests proposal information corresponding to an
alternate allowance outlined below:
B.4.2 Temporary Cooling Allowance:
Refer to section F1.1 for anticipated period of performance. In the event that temporary cooling
of BLDA will be required, the Contractor shall provide a temporary system to ensure
uninterrupted cooling for the occupied building with no disturbance to Courts operations. This
service may be required as early as when the contract is awarded. The Courts envisions this
solution to be temporary chillers and associated temporary power. BLDA is serviced by 208V
power and cannot support 480V services, so this should be taken into account when planning
temporary cooling.
The Contractor shall:
1. Coordinate with the Owner to complete all necessary pre-installation activities
2. Facilitate revew and acceptance of all pre-installation documents by the Owner and the
District prior to installation of the temporary cooling system
3. Provide monthly allowances for cooling system rental (see Attachment K Tab K.3.)
2
DCSC-26-RFP-068
a. Planning, Coordination, Drawings, set up and removal of Temporary Cooling
System
b. All fuel costs for any proposed temporary solution
c. Monthly rental rates for equipment
If this temporary cooling allowance is required, the contractor, utilizing their proposed rates, will
provide the total cost of the service necessary to cool the building ahead of contract scope (See
section B.6) which will be executed through a contract modification.
Reference Section C for additional information on base contract scope and considered options/
allowance.
B.4.3 Unit Cost (Abatement Schedule): Refer to SECTION K, Attachment K Tab K.2.
B.4.4 Alternate Deduct for Bathrooms: Refer to SECTION K, Attachment K Tab K.4.
Provide alternate deducts amounts for the slab cutout, toilet partition replacement, and shaft
expansion on Levels 1, 2, and 3 bathrooms.
B.5. ADDITIONAL PRICING INCLUSIONS
B.5.1 ALLOTMENT(s) The Offeror shall include allowances for the following:
B.5.1 A. Hazardous Material Abatement $100,000.00
B.6 CONSTRUCTION SCHEDULE
The Contractor shall submit a complete project schedule which shows all activities required to
perform the scope of work to include the sequence in which the Contractor proposes to perform
all contractual aspects of the work. The schedule shall be completed by the Contractor and will
be considered a part of the Construction Project Bid-Offer. Table 1 lists the Contractual
Milestones that shall be incorporated into the project schedule. Refer to section F1.1 for period
of performance.
The contractor shall take all means necessary to prep and plan for the removal and replacement
of the chilled water system over the Fall/Winter season of 2026/2027 and shall have the new
system operational to support demand in Spring/Summer 2027 anticipated as March
1st. Contractor will coordinate the date of the removal of the existing chilled water system with
the DC Courts anticipated for November 1st, 2026.
Contract Milestone
Substantial Completion
Final Completion
Calendar Days After NTP
270
300
3
SECTION C: SPECIFICATIONS/WORK STATEMENT
DCSC-26-RFP-068
C.1 SCOPE
The Courts is seeking a qualified contractor to provide construction services as specified in
Attachments J.22 and J.23 for the BLDA Cooling System Upgrades.
The project scope associated with this task order are upgrades of condenser water and chilled
water systems located in the basement and the penthouse. The scope of work includes installation
and construction of the following equipment: Condenser Pump(s), Chilled Water Pump(s), Heat
Exchanger(s), VFDs, and associated Piping and Controls, as well as demolition and removal of
existing equipment.
C.2 APPLICABLE DOCUMENTS
See sections J and K.
C.3 DEFINITIONS
These terms when used in this RFP have the following meanings:
C.3.1 THE CONTRACT DOCUMENTS
The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter
the Agreement), Conditions of the Contract (General, Supplementary and other Conditions),
Drawings, Specifications, Amendments issued prior to execution of the Contract, other
documents listed in the Agreement and Modifications issued after execution of the Contract.
C.3.2 MODIFICATION
A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change
Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work
issued by the CO.
C.3.3 THE CONTRACT
The Contract and documents referenced herein represents the entire and integrated agreement
between the parties hereto and supersedes prior negotiations, representations or agreements,
either written or oral. The Contract may be amended or modified only by a Modification. The
Contract Documents shall not be construed to create a contractual relationship of any kind
between the Owner and a Subcontractor or between any persons or entities other than the Owner
and Contractor. The CM shall, however, be entitled to performance and enforcement of
obligations under the Contract intended to facilitate performance of the CM's duties.
C.3.4 THE WORK
The term "Work" means the construction and services required by the Contract Documents,
whether completed or partially completed, and includes all other labor, materials, equipment and
services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The
Work may constitute the whole or a part of the Project.
C.3.5 THE PROJECT
The Project is the total construction of which the Work performed under the Contract Documents
may be the whole or a part and which may include construction by the Owner or by separate
contractors.
4
DCSC-26-RFP-068
C.3.6 THE DRAWINGS
The Drawings are the graphic and pictorial portions of the Contract Documents showing the
design, location and dimensions of the Work, generally including plans, elevations, sections,
details, schedules and diagrams.
C.3.7 THE PROJECT MANUAL
The Project Manual, or Specifications, are the portion(s) of the Contract Documents consisting
of the written requirements for materials, equipment, systems, standards and workmanship for
the Work, and performance of related services.
C.3.8 THE DIVISION 01
The Division 01 is a volume assembled for the Work which may include the Offering
requirements, sample forms, Conditions of the Contract and Specifications. The terms
“knowledge,” “recognize,” “discover,” their respective derivatives, and similar terms in the
Contract Documents, as used in reference to the Contractor, shall be interpreted to mean that
which the Contractor knows (or should know), recognizes (or should recognize), and discovers
(or should discover) in exercising the care, skill, and diligence required by the Contract
Documents. Analogously, the expression “reasonably inferable” and similar terms in the
Contract Documents shall be interpreted to mean reasonably inferable by a contractor familiar
with the Project and exercising the care, skill, and diligence required of the Contractor by the
Contract Documents. These are included in the Project Manual.
C.3.9 SUBSTANTIAL COMPLETION
Substantial Completion is the stage in the progress of the work when the work or designated
portion thereof is sufficiently complete in accordance with the Contract Documents so that the
Courts can fully, safely, and securely occupy the Project Area. For complete definition refer to
Attachment J.20 Section 9.8.
C.3.10 FINAL PROJECT COMPLETION
Upon receipt of written notice that the work is ready for final inspection and acceptance and
upon receipt of a final Application for Payment, the DC Courts and Construction Manager will
promptly make such inspection and, when the DC Courts and Construction Manager finds the
work acceptable under the Contract Documents and the Contract fully performed, the DC Courts
will promptly issue a final Certificate for Payment, stating that to the best of the Construction
Manager's knowledge, information and belief, and on the basis of the Construction Manager's
on-site visits and inspections, the work has been completed in accordance with terms and
conditions of the Contract Documents and that the entire balance found to be due the Contractor
and noted in the final Certificate is due and payable. The DC Courts Final Certificate for
Payment will constitute a further representation that conditions listed in Section 9.10.2 as
precedent to the Contractor's being entitled to final payment have been fulfilled. For complete
definition refer to Attachment J.20 Section 9.10.
C.3.11 ACCEPTANCE
"Acceptance," as used in this clause, means the act of an authorized representative of the DC
Court by which the DC Court assumes for itself, or as an agent of another, approves specific
services, as partial or complete performance of the contract.
C.3.12 ALLOWANCES
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Solicitation # Details Opening Date Closing Date Other Documents DCSC-26-RFP-068 BLD A Cooling.... ...

District of Columbia Courts

Bid Due: 6/09/2026

...Solicitation # Details Opening Date Closing Date Other Documents DCSC-26-RFP-068 BLD A Cooling..., ...

District of Columbia Courts

Bid Due: 6/09/2026

...Follow DCSC-26-RFP-068 BLD A Cooling Upgrades Active Contract Opportunity Notice ID DCSC-26-RFP... Cooling ...

DISTRICT OF COLUMBIA COURTS

Bid Due: 6/09/2026

...Follow DCSC-26-RFP-068 BLD A Cooling Upgrades Active Contract Opportunity Notice ID DCSC-26-RFP... Cooling ...

DISTRICT OF COLUMBIA COURTS

Bid Due: 6/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.