| Location: | Washington |
|---|---|
| Posted: | Feb 8, 2026 |
| Due: | Feb 17, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: | |
| Solicitation No: | CIP 25-13 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Bid includes improvements to the City’s existing North Tank Reservoir (NTR) including demolition and removal of the existing reservoir interior access ladder and cage system, and the installation of a stainless-steel stair and landing system with a formed concrete pad.

With GovernmentContracts, you can:
...outdoor unit. Enlarge the existing mechanical mezzanine access and provide a pull-down ladder. ...
State Government of Washington
Bid Due: 8/12/2026
...mechanical method for dislodging debris from the trash racks at the East Fish ...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...method for dislodging debris from the trash racks at the East Fish Ladder ...
DEPT OF DEFENSE
Bid Due: 8/03/2026
...method for dislodging debris from the trash racks at the East Fish Ladder ...
DEPT OF DEFENSE
Bid Due: 8/03/2026