| Location: | California |
|---|---|
| Posted: | Sep 13, 2026 |
| Due: | Sep 25, 2026 |
| Agency: | West County Wastewater |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Force Main Assessment Civil Work (rebid)
Addenda: 0
Release Date: 9/11/2026
Due Date: 9/25/2026
West County Wastewater ("WCW") is accepting sealed bids via their e-Procurement Portal, OpenGov until Friday, September 25, 2026 , 4:15 pm PST. Late submissions shall not be accepted.
WCW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an in-line assessment of the Tara Hills Force Main. The assessment will require launching and receiving a series (approximately 3) progressive pigs and one (1) diagnostic and mapping pig (probe). To perform this in-line phase of the assessment, Civil work is required to install a Launch Barrel, install a Receive Barrel, and remove a plug valve and replace it with a full-port gate valve. By-passes and line-stops will be required to perform this work. Additional scope to assess the pipe condition will also be performed by electromagnetic thickness testing. For the consultant to perform this exterior analysis phase of the condition assessment, potholing must be provided by the Civil Contractor to enable access to the pipeline crown. The civil work scope also includes assisting the assessment pigging/probe consultant in launching and retrieving the pigs and probe. The Civil Contractor will also be required to restore site conditions at the (3) locations where civil work is performed and at the location of potholes. The locations of the proposed work sites are specified in the bid documents. The Civil Contractor will also assist the Assessment Consultant by providing support with tasks to insert and retrieve the pigs and the probe, and to supply supplemental water.
West County Wastewater (WCW) provides wastewater collection and treatment services to approximately 93,000 residents. WCW was created December 19, 1921, pursuant to authority of the State of California. Today, WCW operates as a political subdivision of the State of California as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole and some unincorporated areas within western Contra Costa County.
WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with an NPDES permitted capacity of 12.5 million gallons per day (MGD).

With GovernmentContracts, you can:
Bid Title: RFP for Professional Surveying Services J-2150 Category: Capital Improvement Projects Status:
Santa Fe Irrigation District
Bid Due: 10/01/2026
Project ID: 2026-RFP-0439 Title: On-Call Architectural Services Addenda: 0 Release Date: 9/15/2026 Due
City of Pasadena
Bid Due: 10/27/2026
Opportunity ID 228902 Organization City of Los Angeles Department Housing Department, Los Angeles
City of Los Angeles
Bid Due: 10/13/2026
Request for Proposal No. 26-04 Yuba College, Architectural, Engineering Design Services, Campus-Wide Multiple
Yuba Community College District
Bid Due: 10/06/2026