Force Main Assessment Civil Work (rebid)

Location: California
Posted: Sep 13, 2026
Due: Sep 25, 2026
Agency: West County Wastewater
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Force Main Assessment Civil Work (rebid)

Addenda: 0

Release Date: 9/11/2026

Due Date: 9/25/2026

Follow
Force Main Assessment Civil Work (rebid)
Infrastructure and Planning
Project ID: 26-IFB-039
Release Date: Friday, September 11, 2026
ยท Due Date: Friday, September 25, 2026 4:15pm
Posted Friday, September 11, 2026 4:30pm
All dates & times in Pacific Time - Los Angeles
Draft Response Events RSVP No Bid11 days, 21 hours, 44 minutes


Post Information

Posted At:Fri, Sep 11, 2026 4:30 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

West County Wastewater ("WCW") is accepting sealed bids via their e-Procurement Portal, OpenGov until Friday, September 25, 2026 , 4:15 pm PST. Late submissions shall not be accepted.

WCW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an in-line assessment of the Tara Hills Force Main. The assessment will require launching and receiving a series (approximately 3) progressive pigs and one (1) diagnostic and mapping pig (probe). To perform this in-line phase of the assessment, Civil work is required to install a Launch Barrel, install a Receive Barrel, and remove a plug valve and replace it with a full-port gate valve. By-passes and line-stops will be required to perform this work. Additional scope to assess the pipe condition will also be performed by electromagnetic thickness testing. For the consultant to perform this exterior analysis phase of the condition assessment, potholing must be provided by the Civil Contractor to enable access to the pipeline crown. The civil work scope also includes assisting the assessment pigging/probe consultant in launching and retrieving the pigs and probe. The Civil Contractor will also be required to restore site conditions at the (3) locations where civil work is performed and at the location of potholes. The locations of the proposed work sites are specified in the bid documents. The Civil Contractor will also assist the Assessment Consultant by providing support with tasks to insert and retrieve the pigs and the probe, and to supply supplemental water.



Background

West County Wastewater (WCW) provides wastewater collection and treatment services to approximately 93,000 residents. WCW was created December 19, 1921, pursuant to authority of the State of California. Today, WCW operates as a political subdivision of the State of California as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole and some unincorporated areas within western Contra Costa County.

WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with an NPDES permitted capacity of 12.5 million gallons per day (MGD).



Timeline

Release Project Date:
September 11, 2026
Pre-Bid Meeting (Mandatory):
September 17, 2026, 10:00am
West County Wastewater Tarahills Lift Station 2250 Tara Hills Dr. San Pablo CA, 94806.
Alternate Pre-Bid Meeting (Non-Mandatory):
September 18, 2026, 10:00am
West County Wastewater Tarahills Lift Station 2250 Tara Hills Dr. San Pablo CA, 94806.
Question Submission Deadline:
September 21, 2026, 5:00pm
Question Response Deadline:
September 22, 2026, 5:00pm
Proposal Submission Deadline:
September 25, 2026, 4:15pm
Notice to Proceed (Tentative):
November 16, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...for Proposals The Marina Coast Water District wishes to contract a consultant to ...

Marina Coast Water District

Bid Due: 10/09/2026

...Project ID: RFP-DS-0150 Title: Water Use Efficiency Framework Support Addenda: 0 Release Date: ...

West Basin Municipal Water District

Bid Due: 10/20/2026

..., California 92071 Padre Dam Municipal Water District (District) seeks proposals from qualified ...

Padre Dam Municipal Water District

Bid Due: 9/28/2026

...Project ID: 26-075-RFP Title: City Surveyor Consultant Services Addenda: 0 Release Date: 9/4/2026... ...

City of West Sacramento

Bid Due: 10/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.