| Location: | California |
|---|---|
| Posted: | Sep 29, 2025 |
| Due: | Oct 16, 2025 |
| Agency: | Hillsborough town |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Proposals Due: Thursday, October 16, 2025 by 4:00 p.m. in person or by mail to 1600 Floribunda Avenue, Hillsborough, CA.
Pre-proposal Meeting (Non-mandatory): Thursday, October 2, 2025 at 10:00 a.m. at Intersection of Tartan Trail Road and Crystal Springs Road, Hillsborough, CA
Description: The Town is soliciting the services of a qualified contractor to provide design-build services for the emergency replacement of the Tartan Trail Road Bridge crossing over San Mateo Creek. The selected Design-Builder will be responsible for delivering a complete project, including design, permitting support, geotechnical investigations, fabrication, and construction of the new structure, as well as integration with the existing roadway and creek environment. The project must be executed under an accelerated schedule to restore safe public access while ensuring long-term structural performance and environmental compliance.
Contact: Natalie Gribben, Deputy Director of Public Works, ngribben@hillsborough.net
RFP Documents:

With GovernmentContracts, you can:
...or team to provide professional services for design surveying, underground utility survey, geotechnical...
City of Vista
Bid Due: 8/19/2026
...or team to provide professional services for design surveying, underground utility survey, geotechnical...
City of Vista
Bid Due: 8/19/2026
...engineering, surveying, geotechnical, traffic and environmenta l consulting services to aide...
Santa Cruz County
Bid Due: 7/29/2026
...for Proposals (RFP) solicits consultant services to provide surveying, environmental, geotechnical, hydrology...
Yuba County
Bid Due: 7/29/2026