| Location: | Texas |
|---|---|
| Posted: | Sep 28, 2025 |
| Due: | Oct 23, 2025 |
| Agency: | City of Waco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2025-073 |
| Publication URL: | To access bid details, please log in. |
Project Description: The selected contractor shall provide all labor, equipment, materials, appurtenances, and incidentals necessary to complete the demolition, removal, disposal, and installation work required to fully rebuild the Secondary Clarifier #3 at the Central Wastewater Treatment Plant in accordance with Evoqua specifications. The scope includes removing and replacing worn or damaged mechanical components which include center column, rake arms, nuts, bolts, other hardware, skimmers, gear box, motor, and large lower gear box previous purchased by the City of Waco from Evoqua and ensuring existing electrical and process water plumbing are returned to original functioning status. The contractor must perform all necessary adjustments to ensure the clarifier functions per manufacturer standards, coordinate inspection and startup testing with an Evoqua authorized representative (at the City of Waco’s cost), and ensure the unit passes all functionality tests. All work shall comply with applicable OSHA safety standards, municipal codes, and environmental regulations. At project close-out the contractor shall submit as-built drawings, a completion report, and provide a standard labor warranty. The project requires all site work, labor, equipment, and materials complete and in
place as stated in the RFB, shown on the plans, and specified herein.
General Contractor shall self-perform 51% of this project.
Liquidation Fee is $1,000.00 for each day of delay.
TxDot Qualifications are NOT Required for this project.

With GovernmentContracts, you can:
..., submission, administration, and implementation of a funding application through the Texas Water... ...
Rio Grande City
Bid Due: 6/23/2026
...application through the Texas Water Development Board (TWDB) Water Supply and Infrastructure Grants ...
Rio Grande City
Bid Due: 6/23/2026
...application through the Texas Water Development Board (TWDB) Water Supply and Infrastructure Grants ...
Rio Grande City
Bid Due: 6/23/2026
...on Environmental Quality (TCEQ) approvals to allow transmission of production water to distribution. ...
City of Portland
Bid Due: 7/09/2026