| Location: | Connecticut |
|---|---|
| Posted: | Mar 22, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | City of Norwich |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-45 |
| Publication URL: | To access bid details, please log in. |
Project Description: It is the intent of Norwich Public Utilities (NPU) to perform maintenance repair work on the Greenville Dam and associated canal that is currently owned and operated by Norwich Public Utilities (NPU) and is located off North Main St. (CT-12) on the Shetucket River in Norwich. The dam is 401 feet long. The East end section is constructed of a stone and masonry core wall, the center construction is wooden cribbed timbers with stone ballast covered with wooden sheathing, and the West end section is a fish lift. The upstream face of the dam is covered by wooden planking with granite coping along the crest, and wooden cribbed spillway along the downstream side. The center portion of the dam is of all wood crib construction. The lowest section is wood crib construction encased in concrete.

With GovernmentContracts, you can:
...Farmington Canal Heritage Trl. from Rt. 72 to Northwest Dr. in Plainville Start ...
State Government of Connecticut
Bid Due: 7/29/2026
..., is a trail feasibility study to link the Farmington Canal Heritage Trail ...
State Government of Connecticut
Bid Due: 8/07/2026
...residential developments along Canal Street and Howe Avenue. While this growth has brought ...
City of Shelton
Bid Due: 7/24/2026
...residential developments along Canal Street and Howe Avenue. While this growth has brought ...
City of Shelton
Bid Due: 7/31/2026