| Location: | Pennsylvania |
|---|---|
| Posted: | Mar 22, 2026 |
| Due: | Apr 14, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | West Pikeland Township, Chester County |
| Publication URL: | To access bid details, please log in. |
Project Description: The Contract involves, but not limited to the following: streambank stabilization, stream erosion protection/stabilization, storm sewer improvements/replacements, riprap apron, riprap slope protection, guiderail, roadway improvements including mill and overlay, earthwork, and erosion and sediment controls, and lawn restoration.

With GovernmentContracts, you can:
...on the plans. Work also includes the following: excavation, turf matting/erosion control blanket... ...
PennBid
Bid Due: 8/03/2026
...erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting...
PennBid
Bid Due: 8/13/2026
...RESOURCES SILVICULTURE SECTION EROSION SEDIMENT CONTROL The Erosion and Sediment Control Plan... of ...
State Government of Pennsylvania
Bid Due: 8/07/2026
...work included soil erosion and sediment control measures, pavement, rock stabilization methods...
PennBid
Bid Due: 8/24/2026