| Location: | Federal |
|---|---|
| Posted: | Jul 16, 2025 |
| Due: | Jul 18, 2025 |
| Agency: | COMMERCE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 143061-25-0093 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service (NMFS), Alaska Fisheries Science Center (AFSC), Resource Assessment and Conservation Engineering (RACE) Division, is conducting market research under FAR Part 10 to identify potential sources capable of providing specialized flume tank services and scale trawl manufacturing.
NOAA Fisheries AFSC is seeking to conduct flume tank studies to evaluate prototype trawl gear designs to support the modernization and standardization of bottom trawl survey gear used in the eastern Bering Sea, northern Bering Sea, Bering Sea slope, Chukchi Sea, Aleutian Islands, and Gulf of Alaska. The primary objective is to select a universal bottom trawl that can replace two legacy trawl designs—the 83-112 and Poly Nor’easter trawls—constructed with outdated materials that are increasingly expensive and difficult to procure.
These flume tank studies will involve the testing of two 1/8th scale model trawls: a modified "RACE Trawl" with a 3-bridle configuration, and a redesigned Poly Nor’easter trawl with updated bottom wings. Testing will take place at a flume tank facility capable of accommodating these models and must include:
Manufacturing of two 1/8th scale model trawls (including codends).
Construction of multiple bridle configurations.
A flume tank capable of continuous flow at 1 meter/second.
High-definition video and digital still image capture during trials.
Documentation of all flume tank settings and performance data.
The contractor must provide three full days (7 hours per day) of flume tank access and testing, including staffing, project management, and post-test collaboration with NOAA staff to verify and deliver all collected data. Deliverables include: digital stills, unedited HD video, and data sheets summarizing experimental metrics (e.g., headrope height, wing spread, angle of attack, door spread). Final data must be submitted to NOAA within one week of test completion.
This testing is essential to improving gear protocols, reducing material costs, minimizing deployment and retrieval times, and enhancing the precision and accuracy of survey data used for fisheries stock assessments in accordance with the Magnuson-Stevens Fishery Conservation and Management Act.
The anticipated period of performance is from August 1, 2025, to April 30, 2026.
Technical Point of Contact:
Shawn Russell
Marine Equipment Supervisor, RACE Division
Email: shawn.russell@noaa.gov
Phone: (206) 228-8446
| Aug 8, 2025 | [Special Notice (Original)] Flume Tank Facility |

With GovernmentContracts, you can:
...with the requisite knowledge, experience, technical expertise and technical data to provide the ...
DEPT OF DEFENSE
Bid Due: 6/16/2026
...and management support, preparation of study documents, electronic data capture of clinical data..., ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/10/2026
...oversight and management support, preparation of study documents, electronic data capture of clinical... ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/10/2026