| Location: | Pennsylvania |
|---|---|
| Posted: | Aug 19, 2026 |
| Due: | Sep 2, 2026 |
| Agency: | Montgomery County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 6612 |
| Publication URL: | To access bid details, please log in. |
Project Description: A modernized Live Fire Training Building will be constructed at the Public Safety Training Campus to entirely replace the County’s existing 6,400 SF structural burn building, which was constructed in 1986 and has reached the end of its service life as a live fire training building. The new, NFPA 1402-compliant training building will be built in close proximity to the existing burn building.

With GovernmentContracts, you can:
...Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA..., and include ...
JUSTICE, DEPARTMENT OF
Bid Due: 10/30/2026
...- Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology... ...
DEPT OF DEFENSE
Bid Due: 7/13/2031
...throughout the life of the contract. D. The Sustainment Services are for Public ...
State Government of Pennsylvania
Bid Due: 7/29/2028
...in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) Place... training ...
DEPT OF DEFENSE
Bid Due: 6/28/2031