| Location: | California |
|---|---|
| Posted: | Aug 18, 2026 |
| Due: | Aug 30, 2026 |
| Agency: | City of Compton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Tucker Street, Bradfield Ave, and Greenleaf Blvd.
Bid Document: 2026 - Public Works - Specs_Annual Residential Street Rehabilitation-Phase 2D_08-03-26
Plan Document: 2026 - Plans Annual Residential Street Rehabilitation-Phase 2D_06-07-21

With GovernmentContracts, you can:
...),Storm Drain and Paving Bid/Request Name Yorba Linda Boulevard and Mountain View Avenue ...
City of Yorba Linda
Bid Due: 9/24/2026
...: Storm Drain and Paving, Landscaping, Paving (Asphalt or Concrete) Description: The work ...
City of Yorba Linda
Bid Due: 9/24/2026
...Bid Title: RFP for Professional Eng. Svcs. for Rehab of the 15-inch Drain ...
Santa Fe Irrigation District
Bid Due: 10/14/2026
...certification effort indicated improvements to the existing downtown storm drain and pump station... ...
City of Santa Cruz
Bid Due: 9/25/2026