| Location: | California |
|---|---|
| Posted: | Aug 18, 2026 |
| Due: | Aug 30, 2026 |
| Agency: | City of Compton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Tucker Street, Bradfield Ave, and Greenleaf Blvd.
Bid Document: 2026 - Public Works - Specs_Annual Residential Street Rehabilitation-Phase 2D_08-03-26
Plan Document: 2026 - Plans Annual Residential Street Rehabilitation-Phase 2D_06-07-21

With GovernmentContracts, you can:
...Follow Pavement Rehabilitation B836 and B31 Active Contract Opportunity Notice ID FA442726Q1150..., labor, ...
DEPT OF DEFENSE
Bid Due: 9/25/2026
...Bid Number: MB2025-ST02 Bid Title: 2026 Pavement Rehabilitation Project Category: Construction... Services Status: ...
City of Morro Bay
Bid Due: 9/29/2026
...Project ID: Title: TUOLUMNE BOULEVARD PAVEMENT REHABILITATION Addenda: 0 Release Date: 9/1/2026... Due ...
City of Modesto
Bid Due: 10/27/2026
...Basic Information Title Cold plane AC pavement and HMA (Type A). Agency Department...
State Government of California
Bid Due: 9/22/2026