| Location: | Illinois |
|---|---|
| Posted: | May 11, 2026 |
| Due: | May 29, 2026 |
| Agency: | City of Aurora |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Well 119 Maintenance & Rehabilitation
Addenda: 0
Release Date: 5/11/2026
Due Date: 5/29/2026
The City of Aurora is seeking qualified well equipment and maintenance contractors to provide all labor, materials, transportation, tools, supplies, equipment, and appurtenances necessary to complete the satisfactory rehabilitation of existing Well 119 for the Water Production Division.
The existing Well 119 was originally constructed in 1989 and completed in drift formations and is gravel packed. The well consists of 12-inch casing (pitless adapter), 20-inch casing extending from approximately 7 feet to 80 feet below ground surface, and is screened from 80 feet to a total depth of 130 feet.
The primary purpose and intent of this project is formation redevelopment, combined with inspection and repair of all related well equipment, including electrical cables, motor, and column piping.
Over-pumping of the formation with the existing pump has been a long-standing operational issue and is currently mitigated through throttling of the discharge line valve. A replacement pump will be furnished by the City for installation under this contract. The pump is a Byron Jackson Model 10MQH, 3-stage, full-diameter submersible pump.

With GovernmentContracts, you can:
...Number: 26241 Title: East Main Pump Station Shoreline Erosion Repair Description: Erosion repair... ...
Lake County
Bid Due: 6/18/2026
...Bid Number: 2026-MCC Bid Title: DEERFIELD ROAD PUMP STATION MCC IMPROVEMENTS Category: PW ...
Deerfield village
Bid Due: 6/18/2026
...#EIUMEM2701 Invitation for Bid: Fire Alarm Det,Fire Pump& Sup Sys Test & Inspect ...
Illinois Public Higher Education
Bid Due: 6/16/2026
...tanks and existing piping and replace with new water pipes and pumps. Resize ...
DEPT OF DEFENSE
Bid Due: 6/10/2026