| Location: | Illinois |
|---|---|
| Posted: | May 11, 2026 |
| Due: | May 29, 2026 |
| Agency: | City of Aurora |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Well 119 Maintenance & Rehabilitation
Addenda: 0
Release Date: 5/11/2026
Due Date: 5/29/2026
The City of Aurora is seeking qualified well equipment and maintenance contractors to provide all labor, materials, transportation, tools, supplies, equipment, and appurtenances necessary to complete the satisfactory rehabilitation of existing Well 119 for the Water Production Division.
The existing Well 119 was originally constructed in 1989 and completed in drift formations and is gravel packed. The well consists of 12-inch casing (pitless adapter), 20-inch casing extending from approximately 7 feet to 80 feet below ground surface, and is screened from 80 feet to a total depth of 130 feet.
The primary purpose and intent of this project is formation redevelopment, combined with inspection and repair of all related well equipment, including electrical cables, motor, and column piping.
Over-pumping of the formation with the existing pump has been a long-standing operational issue and is currently mitigated through throttling of the discharge line valve. A replacement pump will be furnished by the City for installation under this contract. The pump is a Byron Jackson Model 10MQH, 3-stage, full-diameter submersible pump.

With GovernmentContracts, you can:
...2027 Clamps Bid Tab Village of Park Forest Fiscal 2027 Supply of Water ...
Park Forest village
Bid Due: 6/19/2026
...WATER SUPPLY FACILITIES NAICS Code: 237110 - Water and Sewer Line and Related ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a ...
Western Springs village
Bid Due: 6/05/2026
...PURIFICATION EQUIPMENT NAICS Code: 221310 - Water Supply and Irrigation Systems Place of ...
ENERGY, DEPARTMENT OF
Bid Due: 6/04/2026