| Location: | California |
|---|---|
| Posted: | Nov 5, 2024 |
| Due: | Dec 3, 2024 |
| Agency: | City of Berkeley |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-11689-C |
| Publication URL: | To access bid details, please log in. |
| Spec # | Type | Post Date | Documents |
| 25-11689-C | Construction | 11/04/2024 | Additional Files |
|
|||
The City of Berkeley is advertising STRAWBERRY CREEK CULVERT MAINTENANCE PROJECT – PHASE 1, SPECIFICATION NO. 25-11689-C. Bids will be received at the General Services Division of the Finance Department of the City of Berkeley, 2180 Milvia Street, 3rd Floor, Berkeley, CA 94704 until 2:00 PM on December 3, 2024.
Pre-Bid Site Visit: A non-mandatory pre-bid site meeting will be held at 10:00 A.M., Friday, November 15, 2024 at 2134 Martin Luther King Jr. Way, Berkeley, CA.
The Engineer’s estimate for Package A is $3,200,000.
The Engineer’s estimate for Package A+B is $3,620,000.
The work to be performed under these specifications is divided into two parts: Base Bid (Package A) and Bid Alternate (Package B). The work generally includes but is not limited to:
Structural repairs and geopolymer lining rehabilitation of concrete creek culverts ranging in size from 96-inch x 60-inch horseshoe cross section to 90-inch diameter circular sections; installation of a new creek access structure, modification of an existing access structure, installation of hatches, dewatering, vehicular and pedestrian traffic control, and other related work.
Installation of geopolymer lining is a specialized

With GovernmentContracts, you can:
...Project ID: Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION ...
City of Monterey
Bid Due: 6/30/2026
...: Poured Concrete Foundation and Structure Contractors Construction 238120: Structural Steel... SZC14383 - ...
City of Los Angeles
Bid Due: 7/15/2026
...Type Title Deadline Status Notice On-Call Marine Structures Rehabilitation Commencing July 1, 2026... ...
Port of Oakland
Bid Due: 6/16/2026
...Project ID: Title: Harbor Boulevard Rehabilitation from Chapman Avenue to Convention Way...; Placentia ...
City of Anaheim
Bid Due: 6/25/2026