| Location: | Texas |
|---|---|
| Posted: | Oct 5, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | Hidalgo County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 5024-35-0310-5000-0000-UCP-EP |
| Publication URL: | To access bid details, please log in. |
Project ID: 5024-35-0310-5000-0000-UCP-EP
Title: 2024 Hidalgo Water/Sewer Improvements (Water Well)
Addenda: 0
Release Date: 10/4/2025
Due Date: 10/22/2025
General work description:
Project includes the new construction of water well to be connected to the Water Treatment Plant for water filtration and then routed into the existing water tower for distribution throughout the City of Hidalgo. To include but not limited to the installation of approximately 500 LF of waterline from the water well to the water treatment plant. Other expenditures include but are not limited to repaving of street where water lines will be installed, professional engineering, geo-tech, material testing, advertisements and related appurtenances as they pertain to project completion. The location of the project is on city owned property.
Location: 2401 Olmos Street, Hidalgo, TX 78557

With GovernmentContracts, you can:
...and materials testing, structural engineering, and transportation and traffic engineering IDIQ... systems (fire) ...
Tarrant County College District
Bid Due: 6/25/2026
...Engineering Construction Place of Performance: Del Rio , TX 78840 USA Description View ...
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/06/2026
...National Monument in Waco, Texas. The Contractor shall provide all labor, supervision, materials..., ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/18/2026