Carport

Location: Missouri
Posted: Aug 19, 2026
Due: Aug 26, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 54 - Prefabricated Structures and Scaffolding
Solicitation No: W911S226U4169
Publication URL: To access bid details, please log in.
Follow
Carport
Active
Contract Opportunity
Notice ID
W911S226U4169
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Aug 19, 2026 02:02 pm CDT
  • Original Date Offers Due: Aug 26, 2026 02:15 pm CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Aug 19, 2027
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 5410 - PREFABRICATED AND PORTABLE BUILDINGS
  • NAICS Code:
    • 332311 - Prefabricated Metal Building and Component Manufacturing
  • Place of Performance:
    6079 Cooley AveFort Leonard Wood, MO 65473 65473
Description
Contractor shall supply and deliver within 12 weeks, a complete ready-to-assemble, heavy-duty commercial-grade galvanized steel carport kit measuring 16 feet to18 feet in width by 35 feet to 38 feet in length, 8 feet legs with a maximum height of 10 feet at the roof peak. This is a materials only procurement; the vendor is responsible for delivery of all components but shall not perform any on-site assembly or installation. The structural framing kit must feature a minimum of 14 gauge galvanized steel tubing to ensure industrial grade strength and comprehensive corrosion resistance. The roofing material package must utilize an A frame vertical panel configuration composed of a minimum 29 gauge steel panels with a weather-resistant finish; horizontal roof systems are not acceptable due to drainage requirements over the 36-foot span. All supplied components, when assembled according to the manufacturers instructions, must meet certified engineering ratings capable of resisting wind speeds of at least 130 MPH and a minimum snow load capacity of 30 PSF. Additionally, the vendor shall supply a complete, heavy-duty anchoring kit engineered specifically for the target installation surface (concrete, asphalt, or ground) along with all necessary assembly hardware and detailed, step by step installation instructions. All materials and structural components must strictly comply with ASTM standards for cold-formed steel structural members. Spec Sheet with picture of product required in offer. Buy American Form Required.
Attachments/Links
Contact Information
Contracting Office Address
  • MICC FORT DRUM 4205 PO VALLEY RD
  • FORT DRUM , NY 13602-5220
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Aug 19, 2026 02:02 pm CDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Valley, SW Eagles Parkway (Rte. AA) - Phase A, 10ft wide ADA-compliant trail ...

Missouri Department of Transportation(MDOT)

Bid Due: 9/15/2026

..., drainage, earthwork, traffic control, erosion control, and other incidental items and work ...

Grain Valley city

Bid Due: 9/15/2026

..., drainage, earthwork, traffic control, erosion control, and other incidental items and work ...

Grain Valley city

Bid Due: 9/15/2026

...of removals, clearing and grubbing, grading, excavating, drainage structures, rock blanket, seeding...

Cole County

Bid Due: 9/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.