RUDDER,AIRCRAFT, IN REPAIR/MODIFICATION OF

Location: Federal
Posted: Jul 15, 2025
Due: Sep 2, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 15 - Aircraft and Airframe Structural Components
Solicitation No: N0038325RA090
Publication URL: To access bid details, please log in.
Follow
15--RUDDER,AIRCRAFT, IN REPAIR/MODIFICATION OF
Active
Contract Opportunity
Notice ID
N0038325RA090
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSUP
Sub Command
NAVSUP WEAPON SYSTEMS SUPPORT
Sub Command 2
NAVSUP WSS PHILADELPHIA
Office
NAVSUP WEAPON SYSTEMS SUPPORT
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: Jul 15, 2025 09:50 am EDT
  • Original Response Date: Sep 02, 2025 12:00 am EDT
  • Inactive Policy: Manual
  • Original Inactive Date: Sep 17, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 1560 - AIRFRAME STRUCTURAL COMPONENTS
  • NAICS Code:
  • Place of Performance:
Description
NSN 7R-1560-014949460-KB, TDP VER 002, QTY 2 EA, DELIVERY FOB ORIGIN. This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 300 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 0000/ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Based upon market research, the Government is not using the policies contained in FAR Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.
Attachments/Links
Contact Information
Contracting Office Address
  • PHILADELPHIA 700 ROBBINS AVENUE
  • PHILADELPHIA , PA 19111-5098
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Jul 15, 2025 09:50 am EDTPresolicitation (Original)

Related Document

Aug 12, 2025[Solicitation (Original)] 15--RUDDER,AIRCRAFT, IN REPAIR/MODIFICATION OF
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow 58--KEYBOARD,DATA ENTRY Active Contract Opportunity Notice ID SPE4A726T454T Related Notice... Proposed procurement ...

DEPT OF DEFENSE

Bid Due: 6/11/2026

..., or other permanently attached fastening devices, revolving on an axis. Permits entry ...

DEPT OF DEFENSE

Bid Due: 6/16/2026

...as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) ...

DEPT OF DEFENSE

Bid Due: 7/20/2026

...provide the capability to download automated fire control data into Guided Positioning System ...

DEPT OF DEFENSE

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.