| Location: | Connecticut |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 5, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-20 |
| Publication URL: | To access bid details, please log in. |
This solicitation is being posted to this website for notification purposes only. Questions posted here will not be answered. URL to solicitation documents: https://fairfieldct.bonfirehub.com/opportunities/207370. The Town of Fairfield on behalf of its Engineering Department is seeking CCTV inspection and Installation of Cured in Place Lining Services for the Mill River Pump Station’s force system which consists of dual 14-inch ductile iron sewer pipes installed in 1980. The line is originating at the pump station vault and is terminating at a manhole located on the intersection of Sturges and Unquowa Roads. Only one force main is currently in use. The second force main is a spare force main. The spare force main has not been in service. Each sanitary line is approximately 900 feet long.
Lee Flaherty 725 Old Post Road Fairfield CT, 06824 United States lflaherty@fairfieldct.org

With GovernmentContracts, you can:
...work includes: installation of one catch basin, 1 pipe end and 50 feet ...
State Government of Connecticut
Bid Due: 9/08/2026
...be removed and treated as if it was a lead pipe. Addresses may ...
Town of Putnam
Bid Due: 9/16/2026
.... of perforated pipe and two (2) catch basins included in the bunker ...
City of New Haven
Bid Due: 9/02/2026