| Location: | Connecticut |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 5, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-20 |
| Publication URL: | To access bid details, please log in. |
This solicitation is being posted to this website for notification purposes only. Questions posted here will not be answered. URL to solicitation documents: https://fairfieldct.bonfirehub.com/opportunities/207370. The Town of Fairfield on behalf of its Engineering Department is seeking CCTV inspection and Installation of Cured in Place Lining Services for the Mill River Pump Station’s force system which consists of dual 14-inch ductile iron sewer pipes installed in 1980. The line is originating at the pump station vault and is terminating at a manhole located on the intersection of Sturges and Unquowa Roads. Only one force main is currently in use. The second force main is a spare force main. The spare force main has not been in service. Each sanitary line is approximately 900 feet long.
Lee Flaherty 725 Old Post Road Fairfield CT, 06824 United States lflaherty@fairfieldct.org

With GovernmentContracts, you can:
...Number 8665 Title Trumpet Brook Sewer Relocation Available Date 7/9/2026 4:30 PM Clarification..., ...
City of Waterbury
Bid Due: 8/06/2026
...Sanitary Sewer Evaluation Study The City of Bristol Water and Sewer Department is ...
State Government of Connecticut
Bid Due: 8/07/2026
...Bid Title: Sewer-Storm Manhole Covers, Frames and Risers RFP Category: Town of Enfield, ...
Town of Enfield
Bid Due: 8/11/2026
...Bid/Rfp Number Description Due By Bid 27-181T Sewer Pump Station 10 Force Main ...
Town of Westport
Bid Due: 8/13/2026