| Location: | Connecticut |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 5, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-20 |
| Publication URL: | To access bid details, please log in. |
This solicitation is being posted to this website for notification purposes only. Questions posted here will not be answered. URL to solicitation documents: https://fairfieldct.bonfirehub.com/opportunities/207370. The Town of Fairfield on behalf of its Engineering Department is seeking CCTV inspection and Installation of Cured in Place Lining Services for the Mill River Pump Station’s force system which consists of dual 14-inch ductile iron sewer pipes installed in 1980. The line is originating at the pump station vault and is terminating at a manhole located on the intersection of Sturges and Unquowa Roads. Only one force main is currently in use. The second force main is a spare force main. The spare force main has not been in service. Each sanitary line is approximately 900 feet long.
Lee Flaherty 725 Old Post Road Fairfield CT, 06824 United States lflaherty@fairfieldct.org

With GovernmentContracts, you can:
..., the assessment and administration of a sewer pump maintenance project, and other ...
Granby town
Bid Due: 7/24/2026
...and administration of a sewer pump maintenance project, and other civil engineering tasks ...
State Government of Connecticut
Bid Due: 7/24/2026
...Proposal Water and Sewer 55042 Project ID: 25/26-68 Release Date: Thursday, June 4, ...
Town of Manchester
Bid Due: 6/23/2026