| Location: | Massachusetts |
|---|---|
| Posted: | Jul 15, 2025 |
| Due: | Aug 6, 2025 |
| Agency: | Town of Barnstable |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-IFB-085 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes, but is not limited to, furnishing all labor, materials, and equipment necessary to repair the existing swale leading to landfill infiltration basin number 1 at the solid waste facility. Over the years, the swale has experienced significant erosion and now requires repairs. The installation of new riprap (stone) within the swale will be used to repair the existing erosion and prevent future erosion.

With GovernmentContracts, you can:
...work shall include demolition, cast-in-place cement concrete stairs and ramps; repairs to existing... ...
Commonwealth of Massachusetts
Bid Due: 10/01/2026
...; repairs to existing concrete slab; stone masonry, repointing of existing stone masonry; ...
City of Holyoke
Bid Due: 10/15/2026
...; repairs to existing concrete slab; stone masonry, repointing of existing stone masonry; ...
City of Holyoke
Bid Due: 10/01/2026