| Location: | Vermont |
|---|---|
| Posted: | Feb 24, 2026 |
| Due: | Mar 20, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Construction (Building), Building Rehabilitation, Concrete Bid Description: ***Updated 2/24: Due to weather a second site walk has been schedule on 3/3 and the closing date delayed a week.*** Basement improvements in small commercial building under Corrective Action Plan (SMS#2022-5139): Demo and remove old metal equipment/tank, repair undermined foundation, replace damaged structural beam and columns, install 15-mil (min.) vapor barrier and sub-membrane depressurization system, and install spray polyurethane foam on walls; optional exterior asphalt swale construction. Bids for partial scope will be considered. BABAA and DBRA will apply to this project. RFB documents (including bid specs, drawings, bid form etc.) can be downloaded at the link below or by emailing David Jensen at djensen@stone-env.com. PW to access folder is: 30HenryStreetRFB. https://stoneenvironmentalvt-my.sharepoint.com/:f:/g/personal/djensen_stone-env_com/IgD3NOjbdDujRbbTpbLp9oY0Acq6NoxY9JkVheQfGyxY3Ag?e=lIQlVI
|
||||||||||||||||||||||

With GovernmentContracts, you can:
Reading ER P23-1 (404) Request Date: 7/29/2026 1:05:25 PM Open Date: Closing Date:
State Government of Vermont
Bid Due: 8/21/2026
Williston Road Stormwater Structures Request Date: 7/29/2026 8:42:48 AM Open Date: Closing Date:
State Government of Vermont
Bid Due: 8/27/2026
Follow Dental and Audiology Coordinator for the Vermont Army National Guard Active Contract
DEPT OF DEFENSE
Bid Due: 8/23/2026
Roadway Line Striping and Markings Request Date: 7/24/2026 2:23:32 PM Open Date: Closing
State Government of Vermont
Bid Due: 8/19/2026