| Location: | Kentucky |
|---|---|
| Posted: | Jun 29, 2026 |
| Due: | Jul 16, 2026 |
| Agency: | State Government of Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-785-2600000674-2 |
| Publication URL: | To access bid details, please log in. |
Description: RFB-18-27 Parks - Pennyrile Dam Repairs Study
Department: Facilities & Support Services
Buyer: Janis Wilhoite
Solicitation Number: RFB-785-2600000674-2
Type: Request for Bids (RFB)
Category: Construction
Closing Date and Time: 07/16/2026 01:30 PM EDT
| Line Number | Extended Description | Commodity Line Description | Details | Requested | |
|
1
|
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded**
The BASE BID Work shall include removal of existing low level drawdown system and installation of new reinforced concrete stop log guide walls including new sill and slots for new stop logs, and installation of a new low level drawdown system including new gate thimble, concrete overlay, and concrete operating platform. Leakage reduction items include installation of PZC-18 metal sheet piling along the specified corridor and backfilling the area between sheet piling and upstream face of the dam. On the downstream face perform masonry joint repairs, masonry stone replacement, and tree removal to support leakage reduction. To improve site safety along the concrete walkway, remove and replace existing pipe handrail with OSHA and IBC-compliant handrail system with safety gate at the new gate operator. Existing siphon pipe is to be extended upstream of the sheet piling and existing water line along the walkway handrail for reinstallation or to be replaced in-kind.
Demolition Work shall include full or partial demolition of the following existing structures: pipe handrail along the walkway, existing gate, stem, operator, and components. Localized chipping/demolition of the concrete slab near reported near the bottom of the existing gate may be required to accommodate installation of the new low level drawdown system.
The CONTRACTORs Work shall also include site safety, maintenance of traffic, water control, site security, and site cleanup.
|
RFB-18-27 Parks - Pennyrile Dam Repairs Study
|
Specifications
Commodity Code
912
|
Service From
07/30/2026
Service To
03/01/2027
|
View Purchase History
Additional Information
|

With GovernmentContracts, you can:
...Follow W91237-26-R-A013; Fishtrap Lake Intake Structure and Dam Rehab Active Contract Opportunity... a ...
DEPT OF DEFENSE
Bid Due: 7/29/2026
...Follow W91237-26-R-A013; Fishtrap Lake Intake Structure and Dam Rehab Active Contract Opportunity... structure ...
DEPT OF DEFENSE
Bid Due: 7/29/2026
...Description: RFB-18-27 Parks - Pennyrile Dam Repairs Study Department: Facilities & Support...
State Government of Kentucky
Bid Due: 7/29/2026