| Location: | South Carolina |
|---|---|
| Posted: | Apr 30, 2025 |
| Due: | May 21, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The purpose of this project is to provide storage of stormwater using nature-based design practices. The site will have previously been graded and prepared for Work, which will include installation of a pedestrian pathway and installation of landscaping. The Contractor shall be responsible for the success of the plants and seeded areas for a warranty period of 12 months.

With GovernmentContracts, you can:
...Project: Design/Build Services for Bees Ferry Animal Services Emergency Procurement Ref. #: RFP... ...
Charleston County
Bid Due: 11/24/2026
...Project Delivery Method: Design-Bid-Build Construction Cost Range: $150,000.00 - $250,000.00 Agency... is a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/04/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $225,000 TO $275,000 Prime Contractor License... (Special ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/03/2026
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... the ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 1/05/2027