Wastewater Treatment Plant Tank Grating & Safety Improvements Addendum 1

Location: Pennsylvania
Posted: Aug 17, 2026
Due: Aug 25, 2026
Agency: Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Facility: David L. Lawrence Convention Center
Project: Wastewater Treatment Plant Tank Grating & Safety Improvements
Due Date: Tuesday, August 25, 2026 at 10 AM
Contact: Lucas Kistler, procurement@pgh-sea.com, 412-325-6179

Wastewater Treatment Plant Tank Grating & Safety Improvements

Addendum 1

Attachment Preview

REQUEST FOR QUOTES
For
Wastewater Treatment Plant Tank
Grating & Safety Improvements
July 27, 2026
Owner:
Sports & Exhibition Authority of Pittsburgh & Allegheny County
171 10th Street, 2nd Floor
Pittsburgh, PA 15222
412.393.0200
Owner's Managing Agent for the Facility:
SMG
1000 Fort Duquesne Blvd.
Pittsburgh, PA 15222
412.565.6000

WASTEWATER TREATMENT PLANT TANK
GRATING & SAFETY IMPROVEMENTS
AT THE DAVID L. LAWRENCE CONVENTION CENTER
The Sports & Exhibition Authority will receive pricing for the furnish and install grating and related
safety equipment in the Wastewater Treatment Plant at the David L. Lawrence Convention Center.
Inquiries regarding this opportunity should be made to Lucas Kistler, Director of Facility Services, e-
mail: procurement@pgh-sea.com, phone: 412.325.6179. There is no formal bid for this project. For
details on the scope of work and/or to arrange a site visit, please contact Lucas Kistler.
General Scope:
- Furnish and install the following grating and related safety equipment:
Quantity (2): Fiberglass Pultruded Grating (No Substitution)
o
MFR Model: 350843
Brand: Fibergrate
Material: Fiberglass
Grating Type: Structural Grating
Resin Properties: Flame Resistant
Overall Height: 1.5 in
Overall Width: 4 ft
Overall Length: 10 ft
Bearing Bar Spacing: 1.5 in
Bearing Bar Thickness: 0.6 in
Color: Yellow
Top Surface: Grit-Top
Quantity (4): Fiberglass Pultruded Grating (No Substitution)
o
MFR Model: 350697.02
Brand: Fibergrate
Material: Fiberglass
Grating Type: Structural Grating
Resin Properties: Flame Resistant
Overall Height: 1 in
Overall Width: 4 ft
Overall Length: 6 ft
Bearing Bar Spacing: 1.5 in
Bearing Bar Thickness: 0.6 in
Color: Yellow
Top Surface: Grit-Top
Quantity (As Needed to Complete Installation): Fiberglass Grating Clip (No Substitution)
o
MFR Model: 734250/25
Brand: Fibergrate
Material: 316 Stainless Steel
Type: Clip Only
Fits Bearing Bar Height: 1-1/2 in
Fits Bearing Bar Spacing: 1-1/2 in
Fits Grating Opening Size: 1-1/4 in
File Support Thickness: 14 in
Finish: Unfinished
Meets/Exceeds: ASTM-A-240-16A; ASTM-A-480-16B; ASTM-A-666-15

Quantity (As Needed to Complete Installation): Self-Drilling Screw
o
MFR Model: U31860.025.0200
Screw Size: 14 in
Fastener Length: 2 in
Thread Style: Fully Threaded
Head Type: Hex Washer
Minimum Head Height: 11/64 in
Max Head Height: 3/16 in
Min Head Diameter/Width: 23/64 in
Max Head Diameter/Width: 3/8 in
Drive: External Hex
Drive Size: 3/8 in
Material: Stainless Steel
Quantity (4): Concrete Anchor (TESTING REQUIREMENTS)
o
MFR Model: 2104560
Brand: 3M DBI-SALA
Anchor Material: Stainless Steel
* NOTE: The Commonwealth of Pennsylvania is not a "state plan"
jurisdiction that has its own occupational safety and health code and
enforcement agencies in collaboration with federal OSHA. As such, OSHA
regulations directly apply and are enforced by federal OSHA compliance
officers in Pennsylvania. Section 1910.140(c)(13) of OSHA regulations
requires vertical fall protection lifelines to be secured to independent
anchorage points which must be able to resist an applied load of 5,000
pounds per attached person; or be designed, installed, and used under the
supervision of a qualified person with a factor of safety of at least 2 against
the maximum anticipated loads.
* As such, a qualified professional engineer must test each anchor point and
provide a written certification of results.
- Minimum 1-Year Parts & Labor Warranty
Written quotes will be due at 2:00pm on Monday, August 17, 2026. Please note a site visit is required to
submit a quote for the work listed above.
Quotes should be submitted via email to procurement@pgh-sea.com.

AGREEMENT BETWEEN OWNER AND CONTRACTOR
SHORT FORM CONSTRUCTION OR SERVICES CONTRACT FOR CONTRACTS UNDER
$24,500
OWNER: Sports & Exhibition Authority of Pittsburgh and Allegheny County
171 10th Street, 2nd Floor
Pittsburgh, PA 15222
FACILITY: David L. Lawrence Convention Center
OWNER'S MANAGING
AGENT FOR THE
FACILITY: SMG
DATE: ________________
PROJECT NAME: Convention Center -_ Wastewater Treatment Plant Tank Grating & Safety
Improvements
CONTRACTOR: ______________________________________
PROJECT MANAGER: ______________________________________
WORK - Contractor agrees to perform the work including all labor, materials, and equipment
required to complete the following and as identified below (the "Work"):
_____________________

TIME OF COMMENCEMENT - The Work to be performed under this Contract shall be
commenced as of _____________ and be complete no later than ________________.
CONTRACT PRICE - Owner agrees to pay Contractor for the performance of the Work,
including all items necessary to accomplish and complete the Work, in accordance with all terms
and conditions as stated herein, on the basis identified below:
I. STIPULATED SUM
__ __ For a total lump sum of _______________________
II. COST-PLUS
______ For the direct Cost of the Work, plus a mark-up to cover all other compensation
including all other costs, field and home office overhead, and profit as follows:
Materials and Equipment ___________%
Labor and Foreman ___________%
MASTER Short Form Construction Contract (3).docx

III. UNIT PRICES
______ For the Unit Prices including all materials and equipment, tools, installation, labor,
fringe benefits, insurance, taxes, overhead and profit, as follows:
IV. GUARANTEED MAXIMUM PRICE
______ For the maximum cost of the work plus the Contractor's fee of ______________;
the Guaranteed Maximum Price ("GMP") is not to exceed the sum of
__________________________________ ($_______________).
All savings below the GMP shall accrue in the amount of __________% to the Owner and
____________% to the Contractor.
PERMITS - Prior to commencement of the Work, Contractor shall obtain all required permits to
perform the Work and furnish a copy to Owner. Owner shall assist Contractor, if necessary, in
obtaining such permits.
PAYMENTS - Unless otherwise provided, progress payments will be made within forty-five
45 days of receiving a completed invoice (includes such items as W-9, insurance, lien waiver,
WMBE/MBE report) For construction contracts, final payment and retention of 10% will be
paid within forty-five (45) days of completion, provided all paperwork has been submitted and
approved with the final invoice. Payments must be approved by Project Manager and Facilities
Manager. For construction contracts, Contractor shall waive its right to lien for work paid by
any progress payment and final payment is contingent upon full and final release of liens for all
work performed. Contract Price is payment in full unless reimbursements are clearly authorized
in this Agreement. To the extent that reimbursement of out of pocket costs or expenses are
authorized, such reimbursements will be made in accordance with Owner standard
reimbursement requirements, which requirements are set out in the Authority Expense
Reimbursement Policy, available for viewing at the SEA website (www.sea-pgh.com) under the
tab, INFO CENTER/Frequently Requested Information.
INDEMNIFICATION AND INSURANCE. The Contractor will indemnify, protect, defend
and hold harmless SMG, the Authority, the City of Pittsburgh, the County of Allegheny, the
Commonwealth of Pennsylvania and their successors, assigns, members, directors, officers,
attorneys, employees and agents from and against any and all claims, counterclaims, demands,
damages, losses, liabilities, actions and causes of action, costs and expenses, whatsoever,
including, but not limited to, attorneys fees' ("Claims") sustained by the indemnified persons or
parties and resulting from or arising out of a claim alleging the negligent acts, errors, or
omissions of the Contractor in its performance of the services rendered under this Agreement.
Unless waived in writing by the Authority, the Contractor will maintain general liability
insurance, including automobile liability insurance, related to its activities under this Agreement
in an amount not less than One Million Dollars ($1,000,000) per occurrence and One Million
MASTER Short Form Construction Contract (3).docx (2.9.2018
-2 -

Dollars ($1,000,000) in the aggregate together with an umbrella policy in the amount of Two
Million Dollars ($2,000,000). The Contractor will further maintain workers' compensation
insurance, with respect to any employees of Contractor performing work related to this
Agreement. Prior to execution of this contract, Contractor will deliver certificates of insurance to
the Project Manger identified above, which certificates will evidence required coverage, will
further name the Authority, the City of Pittsburgh, Allegheny County, the Commonwealth of
Pennsylvania and SMG or any other party designated by the Authority, as an additional insured
on general liability coverage. An Actual Notice of Cancellation endorsement will be delivered
that will provide that coverage cannot be canceled except upon not less than thirty (30) days
prior written notice to the Authority. All insurance shall be pursuant to an occurrence basis
policy (rather than claims made policy). Liability insurance shall be primary and non-
contributory. Contractor agrees to waive subrogation in regard to payment of any damages
arising under or related to this agreement and payable through insurance. All insurance carriers
hereunder shall be rated at least "A" in the AM Best Guide. The rights and obligations of the
parties under this paragraph will continue notwithstanding termination of this Agreement for any
reason.
CHANGES - Owner may make changes in the Work. Contractor shall not proceed with changes
(either additions or deletions) without a change order executed by both Owner and Contractor,
stating the methods of payment, the amount and the time involved in the change.
GUARANTY - Contractor warrants and guarantees that the Work shall be performed in a good
and workmanlike manner and that Contractor shall, at its expense, replace or repair all defects to
the Work which occur within one (1) year after final completion.
LAW AND POLICY - Contractor will perform this contract in compliance with applicable law.
In connection with this contract, Contractor (a) will not discriminate against any employee or
applicant or subcontractor because of race, color, religion, sex (including pregnancy, childbirth
and related medical conditions) age, national origin, sexual orientation, gender identity or
expression, disability or marital status, (b) will make a good faith effort to include minority
business enterprise and women business enterprise participation. Contractor shall not disclose
confidential information gained by virtue of this contract. Contractor has not and shall not directly
or indirectly give or promise or offer to give anyone a gratuity in connection with this or any other
contract with the Owner.
MBE/WBE PLAN-----Contractor will make a good faith effort to include minority business
enterprise and women business enterprise participation in accordance with the goals of the
Authority. It is the goal of the Authority that twenty-five percent (25%) of the contract amount be
expended for participation by Minority Business Enterprise and ten percent (10%) of the contract
amount be expended for participation by Women Business Enterprises. Contractor's Plan for
Participation is attached hereto and made a part hereof as Exhibit _B__
BONDS -- If this Contract is for construction, reconstruction, alteration or repair of a public
building, public improvement or other public work and is in an amount in excess of $5,000,
Contractor agrees to provide to Authority a Payment bond and Performance bond, each in the full
amount of the Contract in form and substance satisfactory to Owner. The cost of the bonds is
MASTER Short Form Construction Contract (3).docx (2.9.2018
-3 -

included within the contract price set forth above. Following delivery of required bonds to Owner
and prior to commencement of Work, Contractor may be responsible for filing an Advance Waver
of Liens in form satisfactory to Owner at the Allegheny County Department of Court Records
ACT 45 -- The contract price includes all sales tax and also reflects sales tax savings available to
Contractor pursuant to Act 45 which provides that purchase of certain items, defined as Building
Machinery and Equipment, are exempt from sales taxes when a contractor makes the purchase
pursuant to a contract with a tax-exempt entity. (The Authority is a tax-exempt entity).
PUBLIC WORKS EMPLOYMENT VERIFICATON -- For all public works projects the total
cost of which is in excess of $25,000, Contractor shall deliver to Owner as part of the Contract an
executed Public Works Employment Verification Form wherein Contractor certifies it has used
the federal E-Verify system to compare the information on each of its employees I-9 forms with
the social security numbers in the federal system. Contractor shall inform all subcontractors that
they must verify all employee's social security numbers in the federal E-Verify system. Contractor
will deliver to Owner an executed Public Works Employment Verification Form for each of its
subcontractors.
MISCELLANEOUS - This Contract expresses the total agreement between the parties. All oral
or written negotiations and prior or subsequent dealings are merged into this Contract. Any
amendment of this Contract must be in writing signed by both parties hereto and all terms and
conditions shall remain in effect. All notices shall be in writing to the addresses stated herein.
SPECIAL PROVISIONS - (None)
CONTRACTOR FEDERAL ID NO. ______________________
CONTRACTOR CITY OF PITTSBURGH TAX ID NO. _____________________
Witness the due execution hereof the date set forth above.
OWNER: SPORTS & EXHIBITION AUTHORITY CONTRACTOR:
OF PITTSBURGH AND ALLEGHENY COUNTY [Name of Contractor]
By: By:
Title: Executive Director Title:
MASTER Short Form Construction Contract (3).docx (2.9.2018
-4 -

Exhibit B
SPORTS & EXHIBITION AUTHORITY OF PITTSBURGH
AND ALLEGHENY COUNTY
Minority and Women Business Enterprise Participation
The Authority requires that all contractors and subcontractors1 shall demonstrate a good
faith effort to obtain the participation of Minority and Women Business Enterprises in
work to be performed for the Authority. It is the goal of the Authority that twenty-five
percent (25%) of the contract amount be expended for participation by Minority Business
Enterprises and ten percent (10%) of the contract amount be expended for participation
by Women Business Enterprises. The Minority and Women Business Enterprise
participation of the contract shall be subject to the review of the Equal Opportunity
Review Commission of Pittsburgh.
"Minority Business Enterprise" (MBE) and "Women Business Enterprise" (WBE) means
businesses certified with a PAUCP (Pennsylvania Unified Certification Program)
certification, SBA certification, and the Department of General Services PA Small
Diverse Business Program. Sports & Exhibition Authority (SEA) does not accept self-
certification. Any out of state or other type of certification can be submitted with your
paperwork. It will be reviewed to see if we can accept the certification. The MBE/WBE
must be certified for the specific scope of work it will be responsible for in connection
with the contract. The certification must be current throughout the time the MBE/WBE
will be doing work under the contract.
The bidder/proposer must demonstrate to the Authority that it has made a diligent good
faith effort to meet the Authority's goals for MBE and WBE participation in the contract
work.
MBE and WBE participation may be achieved by any combination of the following:
a. Direct (prime) contract with MBE or WBE. If the direct (prime) contractor is an
MBE or WBE, participation shall be the full amount of the contract.
b. Subcontract for work on the project. If work is subcontracted to Minority and/or
Women Business Enterprises, participation for this element shall be the total
amount of subcontracts with MBE/WBEs for work on the project.
c. It is the intent of the SEA, for all qualified MBE/WBE companies to have an
opportunity on this project in some capacity. Subcontractors who "sub out" more
than 50% of the work assigned will only receive credit for the amount of work
self-performed.
1 "Contractor" refers to the contractor under a construction contract or service contract.
Rev 8.24.2015

d. Supply contracts for the project. If materials are purchased from Minority and/or
Women Business Enterprises, participation for this element shall be 2% of the
amount of the purchase order unless evidence acceptable to the Authority is
submitted that the broker or supplier is acting as a "full service supplier" on this
job and in such case the credit shall be 60% of the dollar value of the purchase
order. Evidence to be submitted to qualify as a "full service supplier" should
include warehouse or storage capacity, inventory records, agreements with
manufacturers, ownership of material handling or delivery equipment and
demonstration of fiscal responsibility on previous sales.
Whether the contractor undertook the following actions, among others, will be considered
in determining if a good faith effort to obtain participation has been made:
i) attended pre-bid/pre-proposal meetings to inform MBE/WBE's of
subcontracting opportunities,
ii) advertised in general, trade, and minority focused media,
iii) provided timely written notice to a reasonable number of MBE/WBE's,
iv) followed up the initial solicitations by contracting MBE/WBE's to
determine interest,
v) selected or reduced the size of specific contract parts to facilitate
MBE/WBE participation,
vi) provided interested MBE/WBE's with plans, specifications, and contract
requirements,
vii) negotiated in good faith with interested MBE/WBE's,
viii) made efforts to provide bonding, line of credit, or insurance assistance to
interested MBE/WBE's,
ix) utilized the services of available minority community organizations and
other organizations that provide assistance in the recruitment and
placement of MBE/WBE's,
x) utilized the services of the office of the Equal Opportunity Review
xi) Commission of Pittsburgh to provide assistance in the recruitment and
placement of MBE/WBE's.
Documentation in the form of letters, meeting notes, copies of advertisements, etc. will
be required to confirm these efforts.
Attention is directed to the following:
a. The bidder/proposer must submit with the bid/proposal the "Certificate of
Minority and Women's Business Enterprise Participation" form attached hereto as
Attachment A (including Schedule A), properly filled out and signed in ink.
Failure to submit this signed certification as part of the bid/proposal is grounds for
rejection of the bid/proposal.
Rev 8.24.2015

b. Prior to award of the contract but within 24 hours of being notified that it is the
apparent successful bidder/proposer, the chosen contractor shall submit to the
Authority its participation plan (the Minority and Women's Participation Plan), in
the form of Attachment B hereto. The chosen contractor shall meet with the
Authority to discuss the implementation of the plan. The chosen contractor's
Minority and Women's Participation Plan must be approved by the Authority
before the contract is awarded. Implementation of the approved plan shall be a
contract obligation.
c. During the course of construction (or performance of services under a service
contractor), the contractor shall submit monthly reports on the form attached
hereto as Attachment C detailing MBE/WBE participation in the contract
compared with the approved plan. Prior approval by the Authority will be
required for any change in the Minority and Women's Participation Plan. The
contractor's compliance with the approved Minority and Women's Participation
Plan shall be monitored by the Authority. The Authority may consider failure of
the contractor to make a good faith effort to fulfill its obligations with respect to
its Minority and Women's Participation Plan during the term of the contract as a
material breach of the contract.
Rev 8.24.2015

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Real Estate Solicitation/Project#: 4400034655 Solicitation/Project Title: Fuels, Tank Wagon... Delivery ITQ Description: The ...

State Government of Pennsylvania

Bid Due: 12/31/2031

...: Storage Tanks Description: The Department of Environmental Protection (DEP) is seeking to ...

State Government of Pennsylvania

Bid Due: 9/30/2026

...: Storage Tanks Description: The Department of Environmental Protection (DEP) is seeking to ...

State Government of Pennsylvania

Bid Due: 12/31/2026

...Project: Malden Water Tank Replacement Contract Nos. 2025-03A & 2025-03B Ref. #: Tri-County... ...

PennBid

Bid Due: 9/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.