| Location: | Connecticut |
|---|---|
| Posted: | Mar 20, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-45 |
| Publication URL: | To access bid details, please log in. |
GREENEVILLE DAM AND CANAL REPAIR
the Greenville Dam and associated canal that is currently owned and operated by Norwich Public Utilities (NPU) and is located off North Main St. (CT-12) on the Shetucket River in Norwich. The dam is 401 feet long. The East end section is constructed of a stone and masonry core wall, the center construction is wooden cribbed timbers with stone ballast covered with wooden sheathing, and the West end section is a fish lift. The upstream face of the dam is covered by wooden planking with granite coping along the crest, and wooden cribbed spillway along the downstream side. The center portion of the dam is of all wood crib construction. The lowest section is wood crib construction encased in concrete.
Robert Castronova 100 Broadway Room 105 Norwich CT, 06360 United States Tel: 860-823-3706 Fax: rcastronova@cityofnorwich.org

With GovernmentContracts, you can:
Yard Waste Grinding and Removal Services This RFP is being posted to this
State Government of Connecticut
Bid Due: 6/24/2026
Installation & Revision of Traffic Control Signals - Various Cities/Towns in D3 Start
State Government of Connecticut
Bid Due: 7/01/2026
***UPDATED 06-05-2026*** Request for Qualifications (RFQ) Regional Freight Study WestCOG seeks to engage
Western Connecticut Council of Governments
Bid Due: 7/15/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Bid Due: 6/24/2026