| Location: | Massachusetts |
|---|---|
| Posted: | Jan 6, 2026 |
| Due: | Feb 4, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
Sidewalk reconstruction, drainage improvements, and pedestrian improvements at select locations along Main Street in Rangeley, ME. Sidewalk improvements will occur in front of Sarge’s Sport Pub & Grub, Rangeley Baptist Church, Rangeley Lakes Builders Supply, and from Mike Cerminanara Landscaping to the intersection of Main Street and Allen Street, as well as installing new sidewalk in front of the Alpine Shop. Sidewalk improvements will involve new sidewalk pavement and base gravels, removing and replacing existing curbing, installing curb tip downs, and associated grading. Drainage improvements will include installing approximately 310 linear feet of new 6-inch underdrain near Rangeley Baptist Church and removing and replacing three 12-inch storm drains along Main Street. Pedestrian improvements include installing an ADA parking space in front of Sarge’s Sport Pub & Grub,
installing a new crosswalk with rapid flashing beacons at Rangeley Lakes Builders Supply, and installing pedestrian signage and markings at select locations along Main Street.

With GovernmentContracts, you can:
..., Combined Sewer and Storm Drains and Emergency Repairs Bid2270_1.pdf Bid List 5% ...
City of Cambridge
Bid Due: 6/27/2027
...of but not limited to: Installation of 12", 6" and 4" Drain lines, ...
Commonwealth of Massachusetts
Bid Due: 8/14/2026
...(or center platform), railings, and canopies including plumbed-in rainwater drains, elevator(s) with sump...
Massachusetts Bay Transportation Authority
Bid Due: 7/31/2026
...is requesting quotes from qualified, licensed, and insured Contractors to provide Preventive and ...
Commonwealth of Massachusetts
Bid Due: 8/13/2026