| Location: | Florida |
|---|---|
| Posted: | Oct 23, 2025 |
| Due: | Nov 6, 2025 |
| Agency: | City of Hollywood |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Large User Meter Replacement
Addenda: 5
Release Date: 9/24/2025
Due Date: 11/6/2025
Large diameter meters play a crucial role in monitoring and controlling various wastewater treatment processes, as well as the reuse water supply, and sewer collection systems. During the replacements, it will be necessary to update the control panels and replace other equipment needed for the meter to function properly.
The Department suggested replacing some large size flow meters when these meters reach the end of their useful life cycles.

With GovernmentContracts, you can:
...Project: Pump Station Control Panels and Other Enclosures Ref. #: ITB-26-00393 Type: ITB ...
Hillsborough County
Bid Due: 9/22/2026
...Project: Lift Station - K070 & Lift Station - K095, Control Panel, Floats, ...
Toho Water Authority
Bid Due: 10/08/2026
...Hubs/Control Panels cabling shall terminate to dedicated patch panels in the local MDF/IDF ...
Osceola County School Board
Bid Due: 9/22/2026
...: 1. Remove and dispose of existing metal panels. 2. Install new 26 ...
New Smyrna Beach Utilities
Bid Due: 10/08/2026