| Location: | Florida |
|---|---|
| Posted: | Oct 23, 2025 |
| Due: | Nov 6, 2025 |
| Agency: | City of Hollywood |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Large User Meter Replacement
Addenda: 5
Release Date: 9/24/2025
Due Date: 11/6/2025
Large diameter meters play a crucial role in monitoring and controlling various wastewater treatment processes, as well as the reuse water supply, and sewer collection systems. During the replacements, it will be necessary to update the control panels and replace other equipment needed for the meter to function properly.
The Department suggested replacing some large size flow meters when these meters reach the end of their useful life cycles.

With GovernmentContracts, you can:
...infrastructure including, but not limited to roads, bridges, and water control system. The ...
State Government of Florida
Bid Due: 6/26/2026
...and construction of a new storm water management system McIntosh Power Plant. The ...
City of Lakeland
Bid Due: 6/19/2026
...Code Description 40151500 Pumps 72101510 Plumbing system maintenance or repair 72121506 Power plant... ...
State Government of Florida
Bid Due: 6/27/2026
...Project ID: Title: McIntosh Power Plant Site Stormwater Modifications Addenda: 1 Release Date: ...
City of Lakeland
Bid Due: 7/13/2026