| Location: | California |
|---|---|
| Posted: | Mar 20, 2026 |
| Due: | Apr 2, 2026 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 908748.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Los Angeles Tennis Center Seismic Remediation (PREQUALIFICATIONS) RE-SOLICITATION | ||
| Project Number | 908748.01 | ||
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a CM at Risk contract are sought from prospective prime contractor bidders (hereafter “bidders”) for the following project:
The project will improve the Los Angeles Tennis Center (LATC) from a Seismic Performance Rating of VI to a Rating of IV to comply with the University of California Seismic Safety Policy. Code-compliance improvements triggered by the seismic work, as well as additional venue-deficiency improvements included in the project, are further described below. Seismic improvements include: • Adding grade beams with battered micropiles at strategic locations throughout the stadium. • Adding one additional grade beam without micropiles to the foundation near the first-floor offices. • Adding fiber-reinforced polymer (FRP) strengthening to the top of the concourse slab at the northwest and southwest corners of the grandstand seating. • Adding strips of FRP along the horizontal and vertical edge joints of the precast concrete seating tiers. • Replacing eroded soil under the west grandstands with concrete slurry to cover the caissons and ensure the integrity of the foundation. Accessibility and Code-compliance improvements include: • Accessibility upgrades to the west restrooms. • Removing existing aluminum benches for seismic work, replacing them with new benches, and widening stepped access aisles. • Adding accessible seating areas at the concourse level. • Adding and replacing drinking fountains. • Adding and modifying handrails and guardrails at stepped seating aisles. • Replacing the fire sprinkler backflow preventer and installing any missing signage required for the existing Fire Department Connection. Additional venue-deficiency improvements include: • Repairing waterproofing and replacing the second-floor terrace surface above the first-floor offices. • Adding waterproofing to the west exterior wall of the first-floor offices. • Replacing Level 1 trench drains with a larger-capacity system to mitigate flooding during heavy rains. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS; ADDENDA, IF ANY; PQ CONFERENCE SIGN-IN SHEET; ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
||
| Estimated Construction Cost | $9,296,000.00 | ||
| Ad for PQ Sub | |||
| 907518.01 | |||

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026