| Location: | Massachusetts |
|---|---|
| Posted: | Apr 15, 2026 |
| Due: | May 5, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project work involves the construction and installation of approximately 4,200 linear feet of 12-inch ductile iron raw water transmission main and 1,200 linear feet of 4-inch HDPE sewer force main. The project work includes, but is not limited to, the installation of hydrants, valves, fittings, connection to existing water mains, associated earthwork, paving, and restoration. The installation of 1,300 linear feet of 8-inch ductile iron finished water main will be bid as an alternate to the project. The time for substantial completion of the water main work is 120 calendar days and for final completion within 150 calendar days. The time for substantial completion of paving after one winter season is 60 calendar days and final completion within 90 calendar days

With GovernmentContracts, you can:
...Header Information Bid Number: BD-27-1596-UF001-UF001-129750 Description: Sewer Rehab Project Bid... Conference: Bulletin Desc: ...
Commonwealth of Massachusetts
Bid Due: 6/18/2026
...DPW Water and Sewer Chemicals Bid No. 26-32 The Town of Amherst is ...
Town of Amherst
Bid Due: 6/17/2026
...Bid Title: Sewer Chemicals Bid FY27 Category: Bids Status: Open Publication Date/Time: 5/21/2026 ...
Town of Spencer
Bid Due: 6/11/2026
...Header Information Bid Number: BD-27-1596-UF001-UF001-129736 Description: Sewer Chemicals Bid Bid... Conference: Bulletin Desc: ...
Commonwealth of Massachusetts
Bid Due: 6/11/2026