| Location: | Massachusetts |
|---|---|
| Posted: | Apr 15, 2026 |
| Due: | May 5, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project work involves the construction and installation of approximately 4,200 linear feet of 12-inch ductile iron raw water transmission main and 1,200 linear feet of 4-inch HDPE sewer force main. The project work includes, but is not limited to, the installation of hydrants, valves, fittings, connection to existing water mains, associated earthwork, paving, and restoration. The installation of 1,300 linear feet of 8-inch ductile iron finished water main will be bid as an alternate to the project. The time for substantial completion of the water main work is 120 calendar days and for final completion within 150 calendar days. The time for substantial completion of paving after one winter season is 60 calendar days and final completion within 90 calendar days

With GovernmentContracts, you can:
...Comm-PASS Category: Construction-Heavy-Highway (Horizontal) / PROJECTS-HIGHWAY Issuing Organization...: No Description: The Work shall ...
Bid Due: 12/31/2099
...RESURFACTING U N S P S C Code: 72-14-11 Infrastructure building and surfacing ...
Commonwealth of Massachusetts
Bid Due: 10/08/2026
...Bid Number: 27-009 Bid Title: Mill and Overlay Paving Projects Category: Construction Status: ...
City of Westfield
Bid Due: 9/23/2026
...Sealed bids for construction of Walnut Street Forcemain Extension Project, Contract 2026-PS02... Maple ...
Town of Shrewsbury
Bid Due: 9/24/2026