| Location: | Massachusetts |
|---|---|
| Posted: | Apr 15, 2026 |
| Due: | May 5, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project work involves the construction and installation of approximately 4,200 linear feet of 12-inch ductile iron raw water transmission main and 1,200 linear feet of 4-inch HDPE sewer force main. The project work includes, but is not limited to, the installation of hydrants, valves, fittings, connection to existing water mains, associated earthwork, paving, and restoration. The installation of 1,300 linear feet of 8-inch ductile iron finished water main will be bid as an alternate to the project. The time for substantial completion of the water main work is 120 calendar days and for final completion within 150 calendar days. The time for substantial completion of paving after one winter season is 60 calendar days and final completion within 90 calendar days

With GovernmentContracts, you can:
...Header Information Bid Number: BD-26-1150-CH015-CH015-129914 Description: RFP 2026-38DPW SEWER... engineering firms to assist ...
Commonwealth of Massachusetts
Bid Due: 6/25/2026
...of Holyoke, Massachusetts Request for Proposals 2026-38DPW For Professional Design Services for Sewer ...
City of Holyoke
Bid Due: 6/25/2026
...Open Pre-Bid Date Filed Sub-bids 00011631 6/13/2024 FY25 Remedial Reconstruction of Sanitary Sewers..., ...
City of Cambridge
Bid Due: 6/27/2027
...-Bid Site Visit Opening Date IFB 26-79 IFB 26-79 Water and Sewer Material, ...
City of Somerville
Bid Due: 6/25/2026