| Location: | North Carolina |
|---|---|
| Posted: | Mar 10, 2025 |
| Due: | Apr 10, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-SM-2023-0001 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-SM-2023-0001 |
| Project Title: | Laurel Manor Storm Drainage Repair |
| Description: | Laurel Manor – The current pipes joints are poorly aligned and pose a threat of creating sink holes. This project will replace the existing pipes 15” and 18” RCP in the same alignment and provide proper pipe bedding and compaction to avoid joint separation. Bidding Documents may be examined at Engineer's office and at: Duncan Parnell, Inc., 201 Glenwood Avenue, Raleigh, NC 27603. |
| Opening Date: | 4/10/2025 1:00 PM |
| Posted Date: | 3/11/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-SM-2023-0001
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-04-10T13:00:00.0000000
|
Posted Date
*
2025-03-10T16:40:20.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2025-03-20T04:00:00.0000000Z
|
Special Instructions
Contact: Todd Rall, todd.rall@raleighnc.gov
|
||
|
Description
Laurel Manor – The current pipes joints are poorly aligned and pose a threat of creating sink holes. This project will replace the existing pipes 15” and 18” RCP in the same alignment and provide proper pipe bedding and compaction to avoid joint separation. Bidding Documents may be examined at Engineer's office and at: Duncan Parnell, Inc., 201 Glenwood Avenue, Raleigh, NC 27603.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can: