| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 18, 2025 |
| Agency: | Pittsburgh Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2024-100-104-1 (2025-172) |
| Publication URL: | To access bid details, please log in. |
Project Description: Pittsburgh Water is requesting bids for the partial demolition and modification of the existing meter vault, including excavating and removing a portion of the concrete vault top slab, removing small diameter plumbing and piping, steel stairs, various conduits and wiring, heaters and lighting equipment, removal of a section of existing 48-inch steel pipe, and the existing 48-inch meter and transmitters, installation of new venturi meter and associated piping, fittings and instrumentation, new steel stairs, heater and lights, constructing reinforced concrete walls to extend above grade, and installing precast concrete roof slabs.

With GovernmentContracts, you can:
...to, connection to existing electrical transformer; installation of PVC conduit and nylon pull ...
PennBid
Bid Due: 6/24/2026
...of electrical conduit, cable, equipment, and instruments. * Installation of irrigation and contact ...
PennBid
Bid Due: 6/19/2026
...and conduit shall be provided as part of Contract 1. Additional work will ...
PennBid
Bid Due: 7/01/2026
...) Installation of all necessary conduit, sleeving, and protections for all subsurface utilities, ...
PennBid
Bid Due: 6/12/2026