| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 18, 2025 |
| Agency: | Pittsburgh Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2024-100-104-1 (2025-172) |
| Publication URL: | To access bid details, please log in. |
Project Description: Pittsburgh Water is requesting bids for the partial demolition and modification of the existing meter vault, including excavating and removing a portion of the concrete vault top slab, removing small diameter plumbing and piping, steel stairs, various conduits and wiring, heaters and lighting equipment, removal of a section of existing 48-inch steel pipe, and the existing 48-inch meter and transmitters, installation of new venturi meter and associated piping, fittings and instrumentation, new steel stairs, heater and lights, constructing reinforced concrete walls to extend above grade, and installing precast concrete roof slabs.

With GovernmentContracts, you can:
...for the rehabilitation by means of Cured-In-Place Pipe liner installation and CCTV inspection...
Pittsburgh Water & Sewer Authority
Bid Due: 11/17/2026
...Waterproofing Membrane Installation; Subsurface Waterproofing Membrane Installation; Pipe Replacements... Project: Gascola Equalization Facility ...
PennBid
Bid Due: 11/03/2026
.... Linear Installation A. Equipment Setup B. Heat Coiled Liner C. Insert Liner ...
State Government of Pennsylvania
Bid Due: 11/03/2026
...and flowable fill, installation of new stormwater structures and pipes, and trench restoration. ...
PennBid
Bid Due: 11/18/2026