| Location: | California |
|---|---|
| Posted: | Jun 29, 2026 |
| Due: | Jul 13, 2026 |
| Agency: | COMMERCE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | REQUIREMENTS-26-3746 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***NOAA'S PACIFIC MARINE ENVIRONMENTAL LABORATORY (PMEL) INTENDS TO NEGOTIATE, ON A SOLE SOURCE BASIS, UNDER AUTHORITY OF FAR 6.103-1. WITH TELEDYNE RD INSTRUMENTS OUT OF POWAY, CA FOR TELEDYNE WORKHORSE 300 kHz ACOUSTIC DOPPLER CURRENT PROFILERS (ADCPs) REPAIR SERVICES.
***THE SOLE SOURCE DETERMINATION IS BASED ON THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION'S (NOAA) REQUIREMENT THAT TELEDYNE RD INSTRUMENTS IS THE MANUFACTURER OF THE RDI ADCP INSTRUMENTS USED IN NOAA PMEL MOORINGS. THE REQUIRED REPAIR SERVICES FOR WORKHORSE 300 kHz ADCP INCLUDE REPLACEMENT OF PROPRIETARY ELECTRONIC BOARDS, FIREWARE UPDATES, CALIBRATION, DIAGNOSTIC TESTING, AND RESTORATION OF INSTRUMENT PERFORMANCE TO MANUFACTURER SPECIFICATIONS. THESE INSTRUMENTS CONTAIN PROPRIETARY HARDWARE, FIRMWARE, AND CALIBRATION PROCEDURES THAT ARE ONLY AVAILABLE THROUGH TELEDYNE RD INSTRUMENTS. A BRAND NAME OR EQUAL REPAIR SERVICE CANNOT BE USED BECAUSE EQUIVALENT VENDORS DO NOT HAVE ACCESS TO OEM REPLACEMENT PARTS, FIREWARE, CALIBRATION STANDARDS, OR MANUFACTURER-AUTHORIZED REPAIR PROCEDURES. THE REPAIRED INSTRUMENTS WILL BE DEPLOYED IN NOAA PMEL OCEANOGRAPHIC MOORINGS TO COLLECT LONG-TERM SCIENTIFIC MEASUREMENTS. FAILURE TO USE OEM REPAIR SERVICES COULD COMPROMISE INSTRUMENT PERFORMANCE, CALIBRATION ACCURACY, DATA QUALITY, RELIABILITY, AND MISISON SUCCESS. PERIOD OF PERFORMANCE IS REQUIRED FROM AWARDED TO AUGUST 30, 2026.
***THIS PRESOLICITATION NOTICE IS NOT A REQUEST FOR COMPETITIVE PROPOSALS AND NO SOLICITATION PACKAGE IS AVAILABLE. HOWEVER, FIRMS THAT BELIEVE THEY CAN FULLY MEET THE GOVERNMENT'S REQUIREMENTS MAY SUBMIT SUBSTANTIATING DOCUMENTATION IN WRITING TO THE IDENTIFIED POINT OF CONTACT WITHIN 15 DAYS AFTER PUBLICATION OF THIS PRESOLICITATION NOTICE. SUCH DOCUMENTATION WILL BE EVALUATED SOLELY FOR THE PURPOSE OF DETERMINING WHETHER OR NOT TO CONDUCT THIS PROCUREMENT ON A COMPETITIVE BASIS. A DETERMINATION BY THE GOVERNMENT NOT TO CONDUCT A COMPETITIVE PROCUREMENT, BASED UPON RESPONSES TO THIS NOTICE, IS SOLELY WITHIN THE DISCRETION OF THE GOVERNMENT. ORAL COMMUNICATIONS ARE NOT ACCEPTABLE IN RESPONSE TO THIS NOTICE.

With GovernmentContracts, you can:
...Follow Electrical System Repair, Switchgear Replacement 2.0 Active Contract Opportunity Notice ID... DISTRIBUTION ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/07/2026
...Invitation to Bid - WTP Electrical Panels Rehabilitation Project San Juan Water District... ...
San Juan Water District
Bid Due: 8/06/2026
...penthouse. The work also includes replacement of the existing cooling coil and humidifier ...
UCLA Capital Programs
Bid Due: 7/28/2026
...County Water District ("OCWD" or District) is seeking bids for replacement of Well ...
Orange County Water District
Bid Due: 8/18/2026