| Location: | Louisiana |
|---|---|
| Posted: | May 11, 2026 |
| Due: | Jun 4, 2026 |
| Agency: | City of Shreveport |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| CMAR Total Fee Proposal | |
|---|---|
| SUMMARY | TOTAL |
| Preconstruction Services (Not To Exceed) Est. 6 Month Duration Construction Management Fee __________% Percentage of Est. Total Cost of Work | $200,000.00 $ |
| TOTAL CMAR FEE PROPOSAL | $ |
Shreveport Regional Airport
Construction Management Fee Proposal
Air Traffic Control Tower Relocation
Date:
Respondent Entity Name:
Est. Total Cost of Work: $24,889,796
CMAR Total Fee Proposal
SUMMARY TOTAL
Preconstruction Services (Not To Exceed)
$200,000.00
Est. 6 Month Duration
Construction Management Fee __________%
$
Percentage of Est. Total Cost of Work
TOTAL CMAR FEE PROPOSAL $
Note: Only Proposers who are invited for an interview shall prepare a Proposer's Fee proposal for the Construction Phase
(Exhibit E). This shall be placed in a separate sealed envelope and be submitted at the beginning of the interview. The
sealed envelope will be opened and used as part of the evaluation of the shortlisted firms after the interview.
The fee proposal is for procurement processes and evaluation only. Any and all proposed fees will follow the terms and
condi(cid:415)ons of the contract and FAA regula(cid:415)ons for conversion to a fixed fee at the (cid:415)me of contract.
EXHIBIT "E" CONSTRUCTION MANAGEMENT FEE PROPOSAL
| Shreveport Regional Airport Air Traffic Control Tower Relocation Cost Estimate Summary Updated: 05/07/2026 | |
| CSI Division Description Total | |
| 01 00 00 General Requirements ($ 1,140,000.00) 02 00 00 Existing Conditions ($ - ) 03 00 00 Concrete ($ 1,882,162.00) 04 00 00 Masonry ($ 184,240.00) 05 00 00 Metals ($ 1,139,510.00) 06 00 00 Woods, Plastics + Composites ($ 227,740.00) 07 00 00 Thermal + Moisture Protection ($ 2,185,343.00) 08 00 00 Openings ($ 1,139,250.00) 09 00 00 Finishes ($ 1,180,281.00) 10 00 00 Specialties ($ 154,190.00) 11 00 00 Equipment ($ 1,514,000.00) 12 00 00 Furnishings ($ - ) 13 00 00 Special Construction ($ - ) 14 00 00 Conveying Equipment ($ 335,000.00) 21 00 00 Fire Suppression ($ 268,120.00) 22 00 00 Plumbing ($ 329,010.00) 23 00 00 HVAC ($ 612,275.00) 25 00 00 Integrated Automation ($ 192,475.00) 26 00 00 Electrical ($ 1,701,010.00) 27 00 00 Communications ($ 132,110.00) 28 00 00 Electronic Safety + Security ($ 451,405.00) 31 00 00 Earthwork ($ 1,788,311.00) 32 00 00 Exterior Improvements ($ 734,243.00) 33 00 00 Utilities ($ 2,849,145.00) Escalation (Assumes 12 Months) ($ 1,409,787.00) Contingency ($ 3,340,189.00) | |
| ($24,889,796.00) |
Shreveport Regional Airport
Air Traffic Control Tower Relocation
Cost Estimate Summary
Updated: 05/07/2026
CSI Division Description Total
01 00 00 General Requirements ($ 1,140,000.00)
02 00 00 Existing Conditions ($ - )
03 00 00 Concrete ($ 1,882,162.00)
04 00 00 Masonry ($ 184,240.00)
05 00 00 Metals ($ 1,139,510.00)
06 00 00 Woods, Plastics + Composites ($ 227,740.00)
07 00 00 Thermal + Moisture Protection ($ 2,185,343.00)
08 00 00 Openings ($ 1,139,250.00)
09 00 00 Finishes ($ 1,180,281.00)
10 00 00 Specialties ($ 154,190.00)
11 00 00 Equipment ($ 1,514,000.00)
12 00 00 Furnishings ($ - )
13 00 00 Special Construction ($ - )
14 00 00 Conveying Equipment ($ 335,000.00)
21 00 00 Fire Suppression ($ 268,120.00)
22 00 00 Plumbing ($ 329,010.00)
23 00 00 HVAC ($ 612,275.00)
25 00 00 Integrated Automation ($ 192,475.00)
26 00 00 Electrical ($ 1,701,010.00)
27 00 00 Communications ($ 132,110.00)
28 00 00 Electronic Safety + Security ($ 451,405.00)
31 00 00 Earthwork ($ 1,788,311.00)
32 00 00 Exterior Improvements ($ 734,243.00)
33 00 00 Utilities ($ 2,849,145.00)
Escalation (Assumes 12 Months) ($ 1,409,787.00)
Contingency ($ 3,340,189.00)
($24,889,796.00)
EXHIBIT "A" COST ESTIMATE SUMMARY

With GovernmentContracts, you can:
...of demolition, clearing and grubbing, structural excavation and backfill, utility relocations...
DEPT OF DEFENSE
Bid Due: 9/23/2026
...establishment; hydroseeding, geotextile placement, road relocation, installation of precast, prestressed...
DEPT OF DEFENSE
Bid Due: 2/06/2027
..., finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 10/02/2026
..., driveway replacements, utility relocations, and related work. Bids: SEALED BIDS SHALL ONLY ...
ST. Charles Parish
Bid Due: 10/13/2026