| Location: | Utah |
|---|---|
| Posted: | Feb 14, 2025 |
| Due: | Mar 5, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | LDF24073 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances indicated in the Contract Documents. The Work generally includes but is not limited to constructing a complete landfill gas collection and conveyance system (installing HDPE pipe with horizontal and vertical wells) and constructing a pump shed, associated piping and leachate evaporation pond.

With GovernmentContracts, you can:
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026