| Location: | Wisconsin |
|---|---|
| Posted: | Sep 3, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | Green Bay School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Q2526-04 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Applicant has networking at all buildings connected by a Wide Area Network. Extreme Networks switching is used from
the Core to the Edge. The Applicant also utilizes Extreme Networks SPBM Fabric and Extreme Network Access Control (NAC)
therefore the Applicant is requiring a solution that is compatible with the existing Extreme environment. Current Edge Switches
are near the end of life or are lacking modern protocols.

With GovernmentContracts, you can:
..., low-voltage controls, emergency stop features, and keyless operation. The contractor will also... ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
...installation of a new electronic access control system with card reader access for ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...arms, retractable boarding ramps, kick plates, safety lighting, hand grips, low-voltage controls..., quality ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
..., storm inlets, and storm manholes; site restoration; erosion control; traffic control; and ...
City of Kenosha
Bid Due: 6/17/2026