| Location: | Oklahoma |
|---|---|
| Posted: | Jan 5, 2026 |
| Due: | Jan 20, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA813725R0049 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
WWYK210129
Tinker AFB (TAFB) Oklahoma is soliciting a source’s sought to see if there are any contractors capable of completing the requirements found in the attached project Statement of Work (SOW) and drawings; TAFB Honeywell partner will be required at a minimum for SOW 4.2.1.3 .
If respondent is only capable of being a General Contractor, please provide your average percentage for Design, G&A, Overhead, Profit and Bonds; as well as a statement that Tinker Honeywell would be a required sub-contractor and an estimated percentage of how much of the required work would be required to be performed with Tinker Honeywell as your prime sub-contractor.
The work to be performed under the terms of this contract consists of furnishing all
design/engineering services, materials, labor, plant, tools, transportation, equipment, testing
services, quality control and incidentals required to accomplish the repair/replacement/addition
of the HVAC controls and change to a BACNet system in B2122 at Tinker Air Force Base (AFB),
Oklahoma (reference the project drawings for additional location information).
The Contractor shall perform a site investigation to verify existing conditions. If necessary,
additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in
B400.
The Contractor shall be responsible for identifying the necessary logistical, architectural, and
structural work elements required to perform the work as described herein. Assemblies,
framework, fixtures, or apparatus not readily identified on the project drawings or this
Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully
operating, and functioning system or systems ready for use by the Government.
Information such as floor plan layouts and dimensions; structural, mechanical, and electrical
data; and location of underground utilities provided by the Government for existing and new
construction are based on available as-built documentation, field observation, and equipment
selected as design basis by the Government. This information is to be considered approximate
and shall be field verified by the Contractor.

With GovernmentContracts, you can: