| Location: | Connecticut |
|---|---|
| Posted: | Apr 29, 2025 |
| Due: | May 16, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 29872 |
| Publication URL: | To access bid details, please log in. |
The Mattatuck Museum is replacing its primary Air Handling Unit (19,000 CFM installed in 1985). The current existing AHU serves six independent ductwork zones. In its place, (6) stand-alone vertical air handling units with accompanying humidifiers will be installed and each serve one of the existing zone configurations. The HVAC System Upgrade trade contractor will be responsible for providing a temporary climate control system for the museum while the existing AH-1 is taken out of service and replaced with the (6) stand-alone air handling units. Exhibit B is provided for reference and includes a possible concept for providing temporary climate control through the exhibit spaces on the museum’s ground level.
Stephanie Harris 144 West Main Street Waterbury CT, 06702 United States Tel: (203) 753-0381 Fax: stephanie@mattmuseum.org

With GovernmentContracts, you can:
...Newfield Construction Newfield Construction Group acting as Construction Manager for The City..., CT ...
State Government of Connecticut
Bid Due: 6/16/2026
...Invitation to Bid for Construction Services Structural/Seismic Review at 395 West Main St. ...
State Government of Connecticut
Bid Due: 7/27/2026
...Type Number Description Due By Opening Status 260045 Construction Management and Inspection...
Town of West Hartford
Bid Due: 6/30/2026
...Invitation to Bid for Construction Services Troop H Maintenance Facility Repairs 100R Washington... ...
State Government of Connecticut
Bid Due: 7/07/2026