| Location: | Missouri |
|---|---|
| Posted: | Sep 26, 2025 |
| Due: | Oct 9, 2025 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW |
KC District, City of Belton, Constructing new storm sewer, including a concrete box culvert, roadway construction and reconstruction, curb and
sidewalk construction, signing, striping and various other improvements |
9/17/25 | 10/9/25 | |
| Addendum 1 |
KC District, City of Belton, Constructing new storm sewer, including a concrete box culvert, roadway construction and reconstruction, curb and
sidewalk construction, signing, striping and various other improvements Addendum 1 |
9/26/25 | 10/9/25 |

With GovernmentContracts, you can:
...and Country, sidewalk installation, grading, and storm sewer improvements 6/9/26 7/1/26 CITY OF ...
Missouri Department of Transportation(MDOT)
Bid Due: 7/01/2026
...bike lane, access connections, storm sewers, curb and gutter, street lighting, asphalt widening... ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/23/2026
...the roadway, New inlets and storm sewer connecting an adjacent drainage project and ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/12/2026
...lighting, storm sewer, curb and gutter, and waterline replacement and tree planting. Primary ...
Lee's Summit city
Bid Due: 6/10/2026