| Location: | Missouri |
|---|---|
| Posted: | Sep 26, 2025 |
| Due: | Oct 9, 2025 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW |
KC District, City of Belton, Constructing new storm sewer, including a concrete box culvert, roadway construction and reconstruction, curb and
sidewalk construction, signing, striping and various other improvements |
9/17/25 | 10/9/25 | |
| Addendum 1 |
KC District, City of Belton, Constructing new storm sewer, including a concrete box culvert, roadway construction and reconstruction, curb and
sidewalk construction, signing, striping and various other improvements Addendum 1 |
9/26/25 | 10/9/25 |

With GovernmentContracts, you can:
..., Roadway resurfacing, construction of a roundabout intersection, storm sewer replacement, etc. 7/1/26... ...
Missouri Department of Transportation(MDOT)
Bid Due: 8/12/2026
..., Roadway reconstruction, sidewalks, storm sewers and inlets, signing and striping, and other... ...
Missouri Department of Transportation(MDOT)
Bid Due: 8/11/2026
...during heavy rain events, therefore the project provides additional grate inlets and storm ...
Missouri Department of Transportation(MDOT)
Bid Due: 8/29/2026
...)". The project is generally described to include, but not limited, to storm ...
Drexel Technologies
Bid Due: 8/04/2026