| Location: | Washington |
|---|---|
| Posted: | Jul 14, 2025 |
| Due: | Jul 22, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EF25RSS34 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers, Walla Walla District, is seeking business sources for a service requirement entitled: "Ice Harbor Dam Navigation Lock Gate" for award of a base contract. This is scheduled to be issued as a Firm Fixed Price Service Contract. The North American Industry Classification System (NAICS) code for this project is 332312 and the associated small business size standard is 500 employees.
This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. This is not a solicitation. Only those firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement.
SUMMARY SCOPE OF WORK:
The work consists of the following major elements:
SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT SYNOPSIS:
(1) Your intent to submit a quote, bid, or proposal for this project when it is formally advertised.
(2) Name of firm with address, phone and point of contact.
(3) CAGE Code, UEI number or a copy of your System for Award Management (SAM) information.
(4) Provide a statement of your firm’s business size (HUBZone, Service-Disabled Veteran Owned, 8(a), small disadvantaged, or woman-owned) with regards to the NAICS code listed above.
(5) Statement of Capability (SOC) stating your skills, experience, knowledge, and equipment required to perform the specified type of work. This should include documentation of past specialized experience and technical competence in similar work, up to three (3) Project examples demonstrating similar work to the Summary of Scope of Work, within the last ten (10) years.
(6) Please provide a statement on the approximate percentage of work expected to be subcontracted for these services.
(7) If bonding is required for this opportunity, would your company still be intersted in submitting a quote/bid/proposal? If not, please explain.
(8) Are there any market conditions or industry practices that you feel the Government needs to be aware of?
(9) What is the anticipated lead time for delivery of described fabricated item(s)?
(10) Please provide feedback on the scope of work. Does your firm have any questions or comments that you would like to share with the Government?
REQUIREMENTS:
1. The fabricating plant and fabricator must be certified under AISC (American Institute of Steel Construction) Quality Certification Program, and must be designated an AISC Certified Plant, Category CBR: Major Bridge Fabrication, IBR: Certified Bridge Fabricator-Intermediate, ABR: Certified Bridge Fabricator-Advanced or HYDA: Certified Metal Hydraulic Fabricator with a fracture control endorsement (FCE or FCEH, as applicable) at time of bid and for the duration of the contract. The fabricator or fabrication plant must possess five years documented experience on projects of similar scope. Submit copies of the AISC certificate indicating that the fabrication plant meets the specified structural steelwork category and documented experience. The nonstructural items such as rubber seals are excluded from the AISC fabricator certification requirement.
Projects of similar scope consist of having fabricated structures with the following minimum requirements:
2. The painting contractor must be certified by Association for Materials Protection and Performance (AMPP) with an SSPC QP 3 certification for all surface preparation and coating application. Submit a copy of the applicable certificates/endorsements. The contractor must be certified/endorsed prior to award of this contract and must remain certified/endorsed for the duration of this contract.
In addition, the painting contractor must possess five years documented experience on projects of similar scope. Submit documentation for experience indicating that the painting contractor has completed projects of similar scope as identified below.
Projects of similar scope consists of having painted steel structures with the following minimum requirements:
---
Capabilities package/response submittal must be received no later than 11:00 AM Pacific Time on 22 July 2025. Any information submitted is voluntary. Submit this information to Mary Seiner via email to Mary.L.Seiner@usace.army.mil.
---

With GovernmentContracts, you can:
...Project ID: Title: Spanaway Lake Fishing Pier Replacement Design Addenda: 0 Release Date: ...
Pierce County
Bid Due: 6/15/2026
...consultants to assist SHA with architectural design and related engineering services for building..., ...
Seattle Housing Authority
Bid Due: 6/11/2026
...Building Renovation and Seismic Structural Upgrade of Unreinforced Masonry Building (URM) Addenda: 0... ...
City of Seattle
Bid Due: 6/10/2026
...and riparian habitat restoration firm able to provide conceptual designs, structural engineering... RFP ...
The Confederated Tribes of the Colville Reservation
Bid Due: 6/26/2026