| Location: | Texas |
|---|---|
| Posted: | Apr 5, 2025 |
| Due: | May 23, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-026 |
| Publication URL: | To access bid details, please log in. |
2025-026
Posted
Jorge Figueroa
(210) 207-1085
jorge.figueroa@sanantonio.gov
5/23/2025
2:00 PM
M0152
21+ Days for Solicitation Notice
4/4/2025
4/4/2025 10:48 pm
91345-Construction, Sewer And Storm Drain;
91347-Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps);
91350-Construction, Street (Major And Residential)(Includes Reconstruction);
91356-Construction, Utility/Underground Projects;
The City of San Antonio (City), Public Works Department (PW) is issuing a Request for Competitive Sealed Proposals (RFCSP) for qualified firms (Respondents) to provide construction services for the Seeling Drainage Phase 4 (Lowery Drive to St. Cloud and Placid Drive from Sage Drive to Pardo Circle) (Project). The project consists of the construction of Seeling Drainage Phase 4 (Lowery Drive to St. Cloud and Placid Drive from Sage Drive to Pardo Circle), a 2022 Bond Program project.
Located in Council District 7, area residents have reported localized drainage issues of storm runoff entering their property. The proposed project will construct underground drainage infrastructure upstream of the previously completed Seeling Channel Phase 3 project, a COSA 2017 Bond project. The project will mitigate localized drainage issues and increase safety and mobility within the project area.

With GovernmentContracts, you can:
...street construction to include sidewalks, curbs, and driveway approaches. A combination of roadside... ...
City of San Antonio
Bid Due: 6/23/2026